|
Re: Question about the bridge
Posted by ChrisH at 1/14/2001 2:48 PM EST
Engineer on team #330, Beach 'Bots, from Hope Chapel Academy and NASA JPL, J & F Machine, Raetheon, et al.
In Reply to: Re: Question about the bridge
Posted by Michael Martus on 1/14/2001 12:50 PM EST:
: As always the drawings are not great. I think this is done on purpose to cause teams to question, communicate and get the details right. The people at FIRST make very few errors, view this as a challenge presented to us, like the real world.
I agree with Rob, AutoCad left to itself would probably dimension things better. By the standards used at the company I work for, the drawings used very poor practice. This is NOT typical of FIRST. Therefore the omissions and poor practice are DELIBERATE. But they also reflect the real world. Because poeple put the things in drawings that are important to them and don't always consider what the guy actually building something really needs.
Speaking from experience
Christopher H Husmann, PE
Lead Engineer Manipulator Team
Team 330 the Beach'Bots
__________________
This message was archived from an earlier forum system. Some information may have been left out. Start new discussion in the current forums, and refer back to these threads when necessary.
|