View Single Post
  #1   Spotlight this post!  
Unread 30-09-2008, 00:42
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,770
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
New Control System How To

I think it is time we start discussing some of the specs on the new control system. Since Beta teams are starting critical wiring by now and the wire strip specifications have changed from last year. According to the manufacturer, WACO, the teminal blocks on the Power Distro need to be stripped 13-14 mm or 1/2" to fully insert in the blocks. Do not tin the wire before insertion. The terminal needs the wire to form to the inside of the block for max current and lowest series resistance.
I will post links to the manufacturer's website soon. (after I get some work done for my paying job) Beta teams are asked to post here or ask questions of interest to all.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.