Quote:
Originally Posted by AdamHeard
I think it would be a terrible blunder to not sell it at the same time.
I'd assume many teams would want to buy a second controller right away for a practice bot.
|
According to
this post on Bill's blog, the issue is with the delivery of parts. In a perfect world, they'd have 3000 of everything waiting for the software to be finalized and they'd ship and sell everything at the same time.
Since it sounds like they are waiting on parts, I'd much rather them start shipping as soon as possible, and wait until there is an extra supply to sell team's second system.