Quote:
Originally Posted by roboticWanderor
Hey there!
Not sure what is gonna go on top of the robot and whether it will provide any extra support, but there does not seem to be much keeping the two halves of the drive train parallel. putting a triangular support on the upper back corners, or bridging the gap about halfway up the chassis would do a lot to keep the two halves stuck together.
If you did that, you could reduce the beefy super structure you have and save more weight than cheese-holes ever could.
Someone else already mentioned my other concerns, good luck!
|
Yeah those were going (bridging the gap) to be added as soon as the rest of the bot was decided upon. We will probably do three to four beams across and one across the top of it.