View Single Post
  #1   Spotlight this post!  
Unread 23-06-2002, 23:37
archiver archiver is offline
Forum Archival System
#0047 (ChiefDelphi)
 
Join Date: May 2001
Location: Pontiac, MI
Posts: 21,214
archiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond reputearchiver has a reputation beyond repute
Update #5 is out

Posted by Raul at 1/25/2001 10:28 AM EST


Engineer on team #111, Wildstang, from Rolling Meadows & Wheeling HS and Motorola.



Notice that perforated sheet stock is allowed.

Also notice that the 5" steel plate at the end of the bridge now extends out 4" instead of 3". I think FIRST is making a mistake doing this - the 1" overlap with the carpet/plywood is much weaker than with a 2" overlap.

Raul


__________________
This message was archived from an earlier forum system. Some information may have been left out. Start new discussion in the current forums, and refer back to these threads when necessary.