Re: Top Ten Things NOT to do with the 2009 FRC Control System
Excellent list...some things I didn't know about such as the grounding issues. Good engineering practices with the 2009 control system:
Don't plan to consider switching programming languages mid-season. Don't even say 'maybe if a xyz mentor comes in we'll switch'.
Don't assume that just because an interface exists on the cRIO (such as SPI) that it is available on the Driver's Station (personal experience here).
__________________
Drive Coach, 1885 (2007-present)
CAD Library Updated 5/1/16 - 2016 Curie/Carver Industrial Design Winner
GitHub
|