View Single Post
  #16   Spotlight this post!  
Unread 18-12-2008, 21:55
NickE's Avatar
NickE NickE is offline
_
FRC #0254 (The Cheesy Poofs)
Team Role: Engineer
 
Join Date: Mar 2008
Rookie Year: 2008
Location: San Jose, CA
Posts: 620
NickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond reputeNickE has a reputation beyond repute
Re: Latest Blog Post - New "Hint"?

Quote:
Originally Posted by rc_cola1323 View Post
Sorry guys, i was the driver for last year, but i totally forget which side of the velcro to put on the control box. Sorry for the stupid question.
The hook side goes on the control board. (for 2008,at least)
Quote:
Originally Posted by 2008 Rulebook Section 6.4.2
Attached to the Alliance Station Wall are three aluminum shelves to support the robot control
systems of the three teams on the ALLIANCE. The support shelf measures approximately 60
inches wide by 12 inches deep. There is a 4-1/2-foot long by two-inch wide strip of Velcro tape
(“loop” side)
along the center of the support shelf that may be used to secure the ROBOT controls
and Operator Interface.

Last edited by NickE : 18-12-2008 at 22:00.
Reply With Quote