Posted by Ken Patton at 2/4/2001 12:26 PM EST
Engineer on team #65, The Huskie Brigade, from Pontiac Northern High School and GM Powertrain.
In Reply to: Purchase date
Posted by Bill Beatty on 2/3/2001 12:26 PM EST:
We do pretty much the same thing as Bill's team. We keep SPI raw materials and off the shelf items (chain, bearings, collars) from previous years stock, because we are too cheap and sensible to not use it. We dont re-use anything that has been modified by us, though.
I have drawings sitting on my office floor (my really big "out box"

right now waiting for SPI material, even though I have identical stock in our machine shop 100 feet away.
Ken