|
Re: team light
<R58> ROBOTS shall use the diagnostic Robot Signal Light provided in the Kit Of Parts. It must be mounted on the ROBOT such that it is easily visible while standing three feet in front of the ROBOT in the STARTING CONFIGURATION. The Robot Signal Light must be connected to the “RSL” supply terminals on the Digital Sidecar, which provides power and control for the light. The team has no direct control over the light and no programming is required.
__________________
"Champions are champions not because they do anything extraordinary but because they do the ordinary things better than anyone else." —Chuck Knoll
2015 Indianapolis District Winner
2014 Boilermaker Regional Industrial Design Award
2013 Smoky Mountain Regional Industrial Design Award
2012 Boilermaker Engineering Excellence Award
2010 Boilermaker Rockwell Innovation in Control Award.
2009 Buckeye J&J Gracious Professionalism Award
2009 Boilermaker J&J Gracious Professionalism Award
2008 Boilermaker J&J Gracious Professionalism Award
2007 St Louis Regional Winners
|