Quote:
Originally Posted by rjmah
OK we and a few other teams got <R11> infractions at Finger Lakes. I only wish that inspectors had checked our mechanism operation during the power up check. Now I notice it is only in the cursory visual inspection list on the inspection sheet. Given this unique constraint this year, I believe it warrants checking with power on.
|
Sorry for your penalty, however, if you read the bottom of the inspection checklist(
http://www.usfirst.org/uploadedFiles...%20Rev%20D.pdf) the team captain and mentor certify that the robot is built to the rules.
We, the Team Mentor and Team Captain, attest by our signing below, that our team’s robot was built after the 2009 Kickoff on January 3, 2009 and in accordance with all of the 2009 FRC rules, including all Fabrication Schedule rules. We have conducted our own inspection and determined that our robot satisfies all of the 2009 FRC rules for robot design.