|
Re: Bridge problems?
Posted by Wayne Doenges at 04/10/2001 9:57 AM EST
Engineer on team #535, G-Force, from Huntington North High School and UT Electronic Controls.
In Reply to: Bridge problems?
Posted by Elliot Johnson on 04/09/2001 11:25 PM EST:
We had the same problem with the Newton field. Our first match we had two robots go over the bridge and unseat the bridge. When we tried to pull the bridge down, we actually lifted our robot off the ground and there was no way for our robot to balance the bridge.
We also had a bridge problem at the Western Michigan Regionals. The bridge was constantly coming off it's fulcrum.
__________________
This message was archived from an earlier forum system. Some information may have been left out. Start new discussion in the current forums, and refer back to these threads when necessary.
|