|
Re: Need for Inspections Rules Changes
As an inspector for several years, I can say problem is rarely ever the inspectors, the process, or the rules. The issue can be solved by the teams in the following four ways.
1. - FOLLOW THE RULES! ALL OF THEM! And DO NOT build it exactly to (or over) the size dimensions.
2. - FINISH THE ROBOT IN BUILD SEASON. This includes bumpers, wiring, and team numbers.
3. - CHECK YOUR OWN ROBOT FOR COMPLIANCE. Anything the inspectors point out, your team should already know about and be working on fixing. I should not have to say "where are your team numbers, or where is your BOM?" and have you reply "Oh we need those?"
4. - Make passing inspection an early-Thursday priority.
The problem is though, as long as the teams are allowed to work on their robots on Thursday, they will, and they'll never learn to finish it before the event.
__________________
Teacher/Engineer/Machinist - Team 696 Circuit Breakers, 2011 - Present
Mentor/Engineer/Machinist, Team 968 RAWC, 2007-2010
Technical Mentor, Team 696 Circuit Breakers, 2005-2007
Student Mechanical Leader and Driver, Team 696 Circuit Breakers, 2002-2004
|