Quote:
Originally Posted by Steven Sigley
I'm interested in seeing whether teams on average prefer to have mentors do most of the work, students do most of the work, or if it's about average.
|
Historically, our robot has been student-designed and student-assembled. However, we'd
prefer to have a higher percentage of work (work defined as done between the ears) done by mentors, should they become available.