View Single Post
  #10   Spotlight this post!  
Unread 06-12-2009, 11:08
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,795
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Cheap replacement for the Power Distribution Board

How about we just stick with the 24 volt requirement for all discussions. That will simplify matters for the majority of the people who read these posts.
Yes, you can stack (series wire) two 12 volt batteries to produce the 24 volt requirement. However, everyone should note that the load on any given battery will change it's terminal voltage dependent on the current supplied to the load and the internal resistance of that battery. It is not uncommon for our robot batteries to be pulled below 8 volts during normal running conditions. That is why the 8 volt trip point was selected in the IFI controller and why Eric and Russ designed the 24 volt power in the new 2008 PD to maintain output below 5 volts. The internal resistance of our batteries is typically 11 mohm and can deliver over 600 amps at full charge. CIM motor stall current is 129 amps so four or more motors in stall can draw down the terminal voltage significantly.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.