View Single Post
  #7   Spotlight this post!  
Unread 02-02-2010, 08:40
pschre's Avatar
pschre pschre is offline
Teacher Coach
AKA: James Schreiner
FRC #0806 (Brooklyn Blacksmiths)
Team Role: Coach
 
Join Date: May 2007
Rookie Year: 2002
Location: Brooklyn
Posts: 29
pschre will become famous soon enoughpschre will become famous soon enough
Send a message via AIM to pschre
Re: Shock Absorbers for the electrical system

In games less bumpy than this year's, my team has known the helpless dismay of having your robot entirely or mostly die on the field due to an electrical connection being knocked loose.

In addition to advocating the securing of PWMs (hot glue is one option but I have seen the whole glue-gobbed end of the wire pop loose anyway, a few short strips of electrical tape stuck to the right angle may work too) I would call attention to the screw-tightening connections of the clip that wires the PD board to the cRIO. Those connections are, in our experience, definitely less reliable than the other wago connections in the control system.

As far as crimping your other terminals, in general make sure you're using connectors appropriately sized for the wire, don't crimp perpendicular to the flat part of the ring terminal/quick disconnect, etc.
__________________


"In this life we cannot do great things. We can only do small things with great love." -- Mother Teresa

"You give yourself to us, O Lord, then selfless let us be, to serve each other in Your name, in truth and charity." -- Robert E. Kreutz, You Satisfy the Hungry Heart

"You have the right to work, but for the work's sake only. You have no rights to the fruits of work. Desire for the fruits of work must never be your motive in working. Never give way to laziness, either...Work done with anxiety about results is far inferior to work done without such anxiety, in the calm of self-surrender...They who work selfishly for results are miserable." -- from the Bhagavad Gita, quoted in Educating Esmé