View Single Post
  #13   Spotlight this post!  
Unread 03-02-2010, 13:53
JesseK's Avatar
JesseK JesseK is offline
Expert Flybot Crasher
FRC #1885 (ILITE)
Team Role: Mentor
 
Join Date: Mar 2007
Rookie Year: 2005
Location: Reston, VA
Posts: 3,632
JesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond reputeJesseK has a reputation beyond repute
Re: GDC at it again!

Quote:
Originally Posted by BrendanB View Post
Wow, part of me wonders how much time they have on their hands these days!?
A quick 120 second calculation is all you need to come up with those numbers. The GDC also hasn't taken into account what constitutes a ROBOT. Their numbers are based upon figures that exclude any scheme to put the spikes together. Thus this supposed spike-only robot has no left over money/weight cost for glue, or even a cardboard box. Since that would take too long to get set up on the field (stacking 2 spikes is a pain, let alone 102...), I conjecture a KOP frame + spike-only robot could not pass inspection.

Thus we need to take 1 spike away and use the extra $ for fishing line to tie them all together on a KOP frame. 101 spikes ... time to take stock in IFI!
__________________

Drive Coach, 1885 (2007-present)
CAD Library Updated 5/1/16 - 2016 Curie/Carver Industrial Design Winner
GitHub
Reply With Quote