Re: 24v Conflict with cRIO and Solenoid
As a rookie you probably don't know about the updates that come out (or your team contact didn't forward them to you.) This was covered in an update. You need to download the updated manual.
<R45> A. The cRIO-FRC power input must be connected to the 24 Vdc supply terminals on the Power Distribution Board. With the exception of one Solenoid Breakout Board, no other electrical load can be connected to these terminals.
It's a good idea to check for these at least twice a week at usfirst.org.
Have fun and happy roboting.
__________________
"Champions are champions not because they do anything extraordinary but because they do the ordinary things better than anyone else." —Chuck Knoll
2015 Indianapolis District Winner
2014 Boilermaker Regional Industrial Design Award
2013 Smoky Mountain Regional Industrial Design Award
2012 Boilermaker Engineering Excellence Award
2010 Boilermaker Rockwell Innovation in Control Award.
2009 Buckeye J&J Gracious Professionalism Award
2009 Boilermaker J&J Gracious Professionalism Award
2008 Boilermaker J&J Gracious Professionalism Award
2007 St Louis Regional Winners
|