|
Bill of Materials
<R24> Individual COMPONENTS or MECHANISMS retrieved from previous ROBOTS and used on 2010 ROBOTS must have their undepreciated cost included in the 2010 ROBOT cost accounting, and applied to the overall cost limits
Do veteran teams need to include the cost of the Crio in the bill of materials?
Ed
2130
|