Quote:
Originally Posted by Steve W
According to Richard Yasui the FIRST Robotics Administrator for TDSB, he made a call to FIRST who said that the robot must be shipped. I am totally confused now. Yes there is a 65 lb withholding of fabricated parts but the rules state
"<R26> During the Build Season: During the period between the Kick-off and the ROBOT shipment deadline, teams are to design and fabricate all the COMPONENTS and MECHANISMS required to complete their ROBOT. They are encouraged to use all the materials, sources and resources available to them that are in compliance with the rules of the 2010 FRC. There is no limit to the amount of time that may be put into this effort, other than via the realities of the calendar. When the ROBOT shipment deadline arrives, all work on the ROBOT must cease and the ROBOT must be placed in a “hands-off” condition. The entire ROBOT (including all FABRICATED ITEMS intended for use during the competition in alternative configurations of the ROBOT) must be crated or bagged (as appropriate for your event), and out of team hands by the shipment deadline specified in Section 4 (with the exception of the items covered by the WITHHOLDING ALLOWANCE).
The red is my highlight. If all work on the robot must cease then how can one withold the whole robot?
|
The last line of <R26> is the important part. It says "With the exception of the items covered by the WITHHOLDING ALLOWANCE" The robot is cover in the withholding allowance as
outlined in this post. The game design committee stated that "There are no requirements on what is included or excluded from the WITHHOLDING ALLOWANCE. Please see Team Update 11 for added clarification." Remember that the GDC rules are the only rules that apply.