View Single Post
  #11   Spotlight this post!  
Unread 01-03-2010, 07:38
Unsung FIRST Hero
Al Skierkiewicz Al Skierkiewicz is offline
Broadcast Eng/Chief Robot Inspector
AKA: Big Al WFFA 2005
FRC #0111 (WildStang)
Team Role: Engineer
 
Join Date: Jun 2001
Rookie Year: 1996
Location: Wheeling, IL
Posts: 10,811
Al Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond reputeAl Skierkiewicz has a reputation beyond repute
Re: Multiplex Festo Valves

Alan et al,

This is the more pertinent answer:

<R45> All electric power utilized by the ROBOT shall be distributed from the load terminals of the Power Distribution Board. Circuits may not bypass the Power Distribution Board to connect directly to the 120-amp loop.
A. The cRIO-FRC power input must be connected to the 24 Vdc supply terminals on the Power Distribution Board. With the exception of one Solenoid Breakout Board, no other electrical load can be connected to these terminals.
__________________
Good Luck All. Learn something new, everyday!
Al
WB9UVJ
www.wildstang.org
________________________
Storming the Tower since 1996.