Re: Crazy Robot Inspection Stories
Years ago, my team did a massive redesign after a pre-ship scrimmage and shipped a robot without a single wire attached. Needless to say, it was a busy day in the pits for me and my electrical team... We still had many wires loose when, at the urging of the inspectors, we began inspection (it was supposed to be a partial mechanical only).
I was soldering a wire to a motor and had a student crimping a ring lug on another wire when the inspector (on the other side of the robot from us) got to the power-up part of the checklist and told the students to power up the robot...
Which they did...
I was not a happy camper...
__________________
Mike Betts
Alumnus, Team 3518, Panthrobots, 2011
Alumnus, Team 177, Bobcat Robotics, 1995 - 2010
LRI, Connecticut Regional, 2007-2010
LRI, WPI Regional, 2009 - 2010
RI, South Florida Regional, 2012 - 2013
As easy as 355/113...
|