
11-04-2010, 09:07
|
 |
Mad Scientist
AKA: Me
 FRC #2040 (DERT)
Team Role: Engineer
|
|
Join Date: Apr 2005
Rookie Year: 2003
Location: Peoria, IL
Posts: 1,979
|
|
|
Re: KOP at Atlanta
Quote:
Originally Posted by David Brinza
You need to have a printed version of the BOM or one available on a computer for the inspector to view during inspection. See this thread.
|
Quote:
|
Originally Posted by rules
<R89> At the time of inspection, teams must submit an electronic copy of their Bill Of Materials (BOM) of all items used in the construction of their ROBOT, and their associated costs, to the inspector (see Rule <R21>). BOMs must be transferred to inspectors at the event via USB drive (inspector or team provided).
|
As per <R89> a printed copy is unacceptable. Only a BOM in electronic form on a ISB drive is acceptable.
__________________
___________________
"We are not now that strength which in old days moved earth and heaven; that which we are, we are;
One equal temper of heroic hearts, Made weak by time and fate, but strong in will
To strive, to seek, to find, and not to yield. "- Tennyson, Ulysses

|