Thread: KOP at Atlanta
View Single Post
  #3   Spotlight this post!  
Unread 11-04-2010, 09:07
Daniel_LaFleur's Avatar
Daniel_LaFleur Daniel_LaFleur is online now
Mad Scientist
AKA: Me
FRC #2040 (DERT)
Team Role: Engineer
 
Join Date: Apr 2005
Rookie Year: 2003
Location: Peoria, IL
Posts: 1,979
Daniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond reputeDaniel_LaFleur has a reputation beyond repute
Send a message via MSN to Daniel_LaFleur
Re: KOP at Atlanta

Quote:
Originally Posted by David Brinza View Post
You need to have a printed version of the BOM or one available on a computer for the inspector to view during inspection. See this thread.
Quote:
Originally Posted by rules
<R89> At the time of inspection, teams must submit an electronic copy of their Bill Of Materials (BOM) of all items used in the construction of their ROBOT, and their associated costs, to the inspector (see Rule <R21>). BOMs must be transferred to inspectors at the event via USB drive (inspector or team provided).
As per <R89> a printed copy is unacceptable. Only a BOM in electronic form on a ISB drive is acceptable.
__________________
___________________
"We are not now that strength which in old days moved earth and heaven; that which we are, we are;
One equal temper of heroic hearts, Made weak by time and fate, but strong in will
To strive, to seek, to find, and not to yield. "
- Tennyson, Ulysses