View Single Post
  #2   Spotlight this post!  
Unread 28-04-2010, 10:48
Lowfategg's Avatar
Lowfategg Lowfategg is offline
Building cars now....
AKA: Tyler Moser
FRC #2016 (Mighty Monkey Wrenches)
Team Role: Mentor
 
Join Date: Dec 2007
Rookie Year: 2005
Location: Bridgewater, NJ
Posts: 471
Lowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond reputeLowfategg has a reputation beyond repute
Send a message via AIM to Lowfategg
Re: $1500.00 Machine shop

I would probably throw in a test indicator (CDCO 26013) for aligning the mill vise and mill head along with the tail stock on the lathe. Its also a good idea to replace the blade on the HF band-saw with a bi-metal (HF 91029-4VGA) one because the included one stinks. Any reason to include both a edge-finder and a wiggler, don't they both do the same thing? The only other thing I would add would be a full set of drill bits (CDCO 42203), and a digital caliper (CDCO 31505) if the team does not already have one. Other then that it looks like a very nice setup for the money.
__________________
Mechanical Engineering Student at WPI.

Mightly Monkey Wrenches FRC #2016 - 2010-12 (Mentor)

Past: FTC #74, FVC #3179, FVC #73, FRC #303, FRC #2753

Last edited by Lowfategg : 28-04-2010 at 10:57.