View Single Post
  #1   Spotlight this post!  
Unread 09-01-2011, 03:16
meakerb's Avatar
meakerb meakerb is offline
Mentor
FRC #3786
Team Role: Mentor
 
Join Date: Jan 2010
Rookie Year: 2009
Location: Washington
Posts: 13
meakerb is an unknown quantity at this point
4.3.6 vs <R24> Software completion

From 4.3.6:
On the software side, writing actual lines of code, verification of syntax, final debugging, etc would all be considered development of the final software implementation, and must be completed during the approved fabrication periods.
However, <R24> states:
During the period between ship date and the competitions, all teams may manufacture SPARE, REPLACEMENT, and UPGRADE PARTS, and develop software for their ROBOT at their home facility.
The clarifying note for <R24> states:
This will allow teams to have the maximum time possible prior to each competition event to develop and complete the software for their ROBOT while maximizing the potential capabilities provided by the control system.
This seems contradictory. Since <R24> is a rule, and 4.3.6 is a lead-in paragraph, wouldn't <R24> have precidence?

Mentor -- Team 3221