In the
Team Drawings, the heights are clearer.
I would assume these heights are the same as the ones on the actual field. They are rounded to the nearest inch.
Middle Post- Low Peg: 38"
- Middle Peg: 75"
- Top Peg: 111"
Side Posts- Low Peg: 30"
- Middle Peg: 67"
- Top Peg: 103"
I calculated these heights by adding the lengths of the vertical sections and half the outside diameter of 1-1/4" Schedule 40 PVC to get the center point of the pipe. There is inaccuracy in that I am not sure how far the pipes go into the T-Fittings.