View Single Post
  #32   Spotlight this post!  
Unread 09-01-2011, 18:21
JohnHorton's Avatar
JohnHorton JohnHorton is offline
Shock Test Dummy
FRC #1100 (Tomahawks)
Team Role: Electrical
 
Join Date: Nov 2010
Rookie Year: 2003
Location: Worcester, MA
Posts: 21
JohnHorton will become famous soon enough
Re: Minibot Standardization (FRC 2011: Logomotion)

As far as deployment goes, I sketched up a rough diagram of a deployment tray that can be slid out to the pole. It has a 2"x6" rectangular notch cut into a 12" square plate to put the minibot into position around the pole, as well as three 1/2" holes drilled into the plate (the front two 2" in from the front and 1" away from the notch to each side, the third 5" from the front and 1" to the left side of the notch) that can be used to align the minibot for deployment.

Low res image attached, and the high res scan is in the attached zip if you're curious.
Attached Thumbnails
Click image for larger version

Name:	Deployment Tray rev 1.JPG
Views:	143
Size:	143.0 KB
ID:	9611  
Attached Files
File Type: zip Deployment Tray rev 1.zip (1.68 MB, 12 views)