|
Re: Wire EDM for 150% of SPI Cost!
Posted by Ken Wilson at 03/08/2001 3:30 PM EST
Engineer on team #248, FEMEX, from Philadelphia Girls High and PECO Energy Company.
In Reply to: Re: Wire EDM for 150% of SPI Cost!
Posted by Raul on 03/07/2001 1:59 PM EST:
We did basically the same thing with an abrasive waterjet-an awesome addition to our shop. Ours can hold sizes to w/in 0.001" over the relatively small area of a 100 tooth sprocket. With ops co$t$
__________________
This message was archived from an earlier forum system. Some information may have been left out. Start new discussion in the current forums, and refer back to these threads when necessary.
|