Go to Post "What's said in the huddle, stays in the huddle..." - Mr. Lim [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rating: Thread Rating: 4 votes, 4.75 average. Display Modes
Prev Previous Post   Next Post Next
  #38   Spotlight this post!  
Unread 16-04-2002, 14:42
Joe Pernick Joe Pernick is offline
Registered User
#0071 (Team Hammond)
 
Join Date: Nov 2001
Location: Hammond, Indiana
Posts: 11
Joe Pernick is an unknown quantity at this point
Send a message via AIM to Joe Pernick
We start with a meeting to get everyones ideas and after the students construct the playing field. This takes place in a Hammond school building built in the 30s in an old band room. This location will almost hold a playing field and has several rooms we can store parts and tools and a room we use with the grinder and sander and saws that are loud. We hold all of our meetings in this room except for those working in a PC computer lab in another part of this same building. (The Hammond Area Career Center) This room has a very high ceiling so it works well for handling balls and other flying objects. Its located on the second floor and everything has to be carried up and down two flights of stairs. (goals, parts, tools, robot etc.)
Most all of the building takes place in this old band room with Bill Beatty and his engineers, several parents, and most all of our students in attendance 5 nights per week and all day Saturday and Sunday for the entire build phase. After the initial meeting everyones ideas are compiled and a basic design takes shape. This is more defined by Mr. Beatty. The engineers and our students and parents start putting together the new robot. The students do really build a portion of the robot but the engineers have the final say. The construction takes place on one end of this room on the playing field. Any machining required is done at Beatty Machine and Bemcor or several other generous machine shops in town (Brian Beatty's buddies) but prmarilly the Beatty shop. The Hammond Schools location does not have machine shop facilities. Students and Mr. Noble (a Beatty engineer) will construct all the electrical systems
All testing and driving practice are performed in this same room. (after all the metal shavings and the White Castle boxes are cleaned up) We have human player practice in our parking lot and also in this room too.
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Who should build the field? Rich Wong General Forum 17 08-03-2006 17:38
Who like our robot? Tton General Forum 8 06-04-2003 21:39
Who built your robot? Wayne Doenges General Forum 101 14-02-2003 23:24
Who has their 2003 robot complete? LBK Rules General Forum 30 09-01-2003 22:48
What? Isnt everyone building new functions on their robot?? archiver 2001 4 24-06-2002 01:34


All times are GMT -5. The time now is 16:37.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi