|
we built a very approximate bridge. It didn't have the diamond plating on the sides and the weights on the poles were not exact, though we attempted to compensate.
We made 2 goals fairly close to the specs, except that we modified several kee-klamps that we had instead of buying new ones to hold the "grab-bar"
Our philosophy is to build the essentials as quickly and cheaply as possible. After it's built, we attempt to compensate for any modifications that we made to the original design.
We didn't have any trouble with major differences between our field and FIRST's, but we ran out of time to use our field a lot.
|