Go to Post We were all rookies once, and we really have two ways to go about things: either take a page from the powerhouses and emulate their style, or complain about not having anything and risk falling into oblivion. - George A. [more]
Home
Go Back   Chief Delphi > FIRST > General Forum > FIRST E-Mail Blast Archive
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 13-01-2005, 12:24
Unsung FIRST Hero
Rich Wong Rich Wong is offline
NYC FIRST Planning Committee Member
no team (NYC FIRST)
Team Role: Mentor
 
Join Date: Jan 2002
Rookie Year: 1999
Location: Brooklyn, NY
Posts: 1,674
Rich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond reputeRich Wong has a reputation beyond repute
Send a message via AIM to Rich Wong
**FIRST EMAIL**/Parts Update

Greetings Teams:

Please read the below parts update. Please note that some of these may be repetitive from the 1/11/2005 Team Update #01.

Transmission Collars
This item was never intended to be in the Kit of Parts. It is team supplied.

The specifications were actually sent out in the Advanced Purchased Items list. Item #4 on the list states that you will need a 3/4" inch PVC Schedule 80 pipe (or a 3/4" Schedule 80 PVC pipe nipple). This information is also shown in the design details shown in the FIRST 2005 Transmission Manual - RevA, Drawing # FRC-2005-112-010 available on the Innovation First Web site at:

http://www.ifirobotics.com/docs/FIRS...anual_RevA.pdf

Fisher Price Motors
There was a typo in the Kit of Parts list. It states that the Fisher Price Motor is a w/21T #7, stall torque 532.19 mNm. This is incorrect. Teams have been sent a w/13T, stall torque 647.2 mNm.

Master Link, Chain (in the Innovation First, Inc Item 1 Transmission Kit)
Teams should find 2 master links. One is in the box with the chain located in the transmission box. The other master link is in a separate bag located in the transmission box.

Clippard Tank (pneumatics)
Teams can order them from IFI for the cost of postage and a small handling fee.

Go Teams!
__________________
popularis de ob instinctus agnitionis scientia technologia
Home website: www.nycnjfirst.org
Member of NEMO & e^(i*pi)+1 Fraternity.
Member of Friends of Robots
Member of NYCFIRST Planning Committee
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
2005 FRC Team Update 01 dez250 General Forum 16 13-01-2005 21:53
Update # 16 Bcahn836 General Forum 1 01-04-2004 20:21
Powerbook update? evulish Chit-Chat 1 01-08-2003 18:48
Update #3 is online archiver 2000 0 24-06-2002 00:22
Palm DOC - Update 4 Available! archiver 2001 1 23-06-2002 23:03


All times are GMT -5. The time now is 23:44.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi