|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#13
|
||||
|
||||
|
Re: RS775 Gearboxes
On the 10 day maximum lead time to ship the P60 they gave my team, today is the 10th day. We haven't heard anything from BB, and we were planning on using a P60 with the 775 for our lift.
At this point we're seeking other options with a FP instead. :/ |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|