|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
|
|
Thread Tools | Rate Thread | Display Modes |
|
|
|
#1
|
|||||
|
|||||
|
Re: pic: Electrical hasn't gotten to the bridge yet so...
Mike,
Before you take another picture, can you please insulate all the battery wiring terminals? The battery is capable of welding if a dropped tool falls across the bare metal. That dead short will get extremely hot, extremely fast and will damage the battery, possibly to the point of injuring someone. Inspectors are asked to stop any inspection until all terminals are insulated. |
|
#2
|
|||
|
|||
|
Re: pic: Electrical hasn't gotten to the bridge yet so...
Good. You wouldn't believe how many times in the past I'd find teams without insulated terminals. And at times, I thought I was the only inspector checking. I made teams show me all their batteries.
|
|
#3
|
|||||
|
|||||
|
Re: pic: Electrical hasn't gotten to the bridge yet so...
Please add "show me all your chargers" as well.
|
|
#4
|
|||
|
|||
|
Re: pic: Electrical hasn't gotten to the bridge yet so...
Quote:
|
|
#5
|
|||||
|
|||||
|
Re: pic: Electrical hasn't gotten to the bridge yet so...
Excellent!
|
|
#6
|
||||
|
||||
|
Re: pic: Electrical hasn't gotten to the bridge yet so...
Nice! I thought we were the only team to use transparent heat shrink for the same reason! ( P.S. It also gives the inspectors something to catch until they see that it IS insulated.)
![]() |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|