Go to Post That's not duct tape as adhesive, it's duct tape as decoration! :p - Don Knight [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rating: Thread Rating: 6 votes, 5.00 average. Display Modes
  #1   Spotlight this post!  
Unread 11-05-2011, 22:06
bduddy bduddy is offline
Registered User
FRC #0840 (ART)
Team Role: Alumni
 
Join Date: Jan 2007
Rookie Year: 2005
Location: San Bruno, CA
Posts: 869
bduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond reputebduddy has a reputation beyond repute
Re: Bill's Blog, 5/11/11 "Wait, Did he say pool"

Quote:
Originally Posted by Billfred View Post
I've got a better idea...

Standard FRC match cycle is six minutes, start to start--that means that, in a 2:15 match, the field is hot only 37.5% of the time. If those matches went to three full minutes, and the match cycle expanded to seven minutes, then the hot-field percentage goes to 42.9%. 3:15 and seven-minute cycle? 46.4%. For the same amount of time spent doing load-out, reset, load-in, and introductions, you get that much more time of the game being played.

Robot wouldn't run for that long, you say? Imagine if your matches were three minutes, but your robot only ran for two minutes. Just like the real world, you can't run your machinery around the clock--maintenance, repair, slow business, constraints on supply from upstream, operator rest periods, and so on all conspire to limit how much a piece of machinery can actually run. So with a time limit on each robot, you now have an additional layer of coordination necessary to achieve game objectives.

It wouldn't work for all games--Lunacy would be awful with this scenario--but it could afford FIRST some flexibility in scheduling (or even some other objectives; imagine if robots above 110 pounds had a one-second delay in activation in the middle of the match.)
I was thinking a related idea. Four robots per alliance - matches of 4:30. Budget four minutes between matches, and each team will have roughly the same number of matches as before. I was also thinking of having one robot off the field at all times, so the field would not be so crowded... teams could also change batteries/etc. while their robot was off the field.
__________________

Does anyone else remember when TBA signatures actually worked?
Reply With Quote
  #2   Spotlight this post!  
Unread 11-05-2011, 22:09
Billfred's Avatar
Billfred Billfred is offline
...and you can't! teach! that!
FRC #5402 (Iron Kings); no team (AndyMark)
Team Role: Mentor
 
Join Date: Feb 2004
Rookie Year: 2004
Location: The Land of the Kokomese, IN
Posts: 8,548
Billfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond reputeBillfred has a reputation beyond repute
Re: Bill's Blog, 5/11/11 "Wait, Did he say pool"

Quote:
Originally Posted by bduddy View Post
I was thinking a related idea. Four robots per alliance - matches of 4:30. Budget four minutes between matches, and each team will have roughly the same number of matches as before. I was also thinking of having one robot off the field at all times, so the field would not be so crowded... teams could also change batteries/etc. while their robot was off the field.
I wouldn't see that happening with anything remotely resembling a current FRC robot--anything that required the gates would become too dangerous to try to pull on and off while the field was live. That said, locations on the field to park shut-down robots might be a workable solution.
__________________
William "Billfred" Leverette - Gamecock/Jessica Boucher victim/Marketing & Sales Specialist at AndyMark

2004-2006: FRC 1293 (D5 Robotics) - Student, Mentor, Coach
2007-2009: FRC 1618 (Capital Robotics) - Mentor, Coach
2009-2013: FRC 2815 (Los Pollos Locos) - Mentor, Coach - Palmetto '09, Peachtree '11, Palmetto '11, Palmetto '12
2010: FRC 1398 (Keenan Robo-Raiders) - Mentor - Palmetto '10
2014-2016: FRC 4901 (Garnet Squadron) - Co-Founder and Head Bot Coach - Orlando '14, SCRIW '16
2017-: FRC 5402 (Iron Kings) - Mentor

94 events (more than will fit in a ChiefDelphi signature), 14 seasons, over 61,000 miles, and still on a mission from Bob.

Rule #1: Do not die. Rule #2: Be respectful. Rule #3: Be safe. Rule #4: Follow the handbook.
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 03:27.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi