Go to Post Relax. Have fun. Enjoy the improvements. Build what you want to. - Rich Kressly [more]
Home
Go Back   Chief Delphi > Other > FIRST Tech Challenge
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rating: Thread Rating: 11 votes, 4.64 average. Display Modes
  #76   Spotlight this post!  
Unread 28-05-2011, 17:06
wrhsvex wrhsvex is offline
Registered User
no team
 
Join Date: May 2011
Location: washington
Posts: 2
wrhsvex is an unknown quantity at this point
Re: how to build a VEX programming module

ya i know that but we cant afford the vex kit and we are going to nationals soon
Reply With Quote
  #77   Spotlight this post!  
Unread 28-05-2011, 17:16
Chris is me's Avatar
Chris is me Chris is me is offline
no bag, vex only, final destination
AKA: Pinecone
FRC #0228 (GUS Robotics); FRC #2170 (Titanium Tomahawks)
Team Role: Mentor
 
Join Date: Dec 2008
Rookie Year: 2006
Location: Glastonbury, CT
Posts: 7,707
Chris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond reputeChris is me has a reputation beyond repute
Send a message via AIM to Chris is me
Re: how to build a VEX programming module

Vex Nationals is in about 10 months.
__________________
Mentor / Drive Coach: 228 (2016-?)
...2016 Waterbury SFs (with 3314, 3719), RIDE #2 Seed / Winners (with 1058, 6153), Carver QFs (with 503, 359, 4607)
Mentor / Consultant Person: 2170 (2017-?)
---
College Mentor: 2791 (2010-2015)
...2015 TVR Motorola Quality, FLR GM Industrial Design
...2014 FLR Motorola Quality / SFs (with 341, 4930)
...2013 BAE Motorola Quality, WPI Regional #1 Seed / Delphi Excellence in Engineering / Finalists (with 20, 3182)
...2012 BAE Imagery / Finalists (with 1519, 885), CT Xerox Creativity / SFs (with 2168, 118)
Student: 1714 (2009) - 2009 Minnesota 10,000 Lakes Regional Winners (with 2826, 2470)
2791 Build Season Photo Gallery - Look here for mechanism photos My Robotics Blog (Updated April 11 2014)
Reply With Quote
  #78   Spotlight this post!  
Unread 28-05-2011, 17:45
gblake's Avatar
gblake gblake is offline
6th Gear Developer; Mentor
AKA: Blake Ross
no team (6th Gear)
Team Role: Mentor
 
Join Date: May 2006
Rookie Year: 2006
Location: Virginia
Posts: 1,936
gblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond reputegblake has a reputation beyond repute
Re: how to build a VEX programming module

Quote:
Originally Posted by wrhsvex View Post
ya i know that but we cant afford the vex kit and we are going to nationals soon
Wherever you are going and whenever you are going there, building one of these isn't something you just sit down and do overnight.

Borrow one from someone/somewhere, or buy an inexpensive used one from eBay. Either of those will be far easier than building one from scratch.

Blake
PS: Which national competition are you headed to? TSA, BEST, The Create Foundation's tournament? something for PLTW? something else?
__________________
Blake Ross, For emailing me, in the verizon.net domain, I am blake
VRC Team Mentor, FTC volunteer, 5th Gear Developer, Husband, Father, Triangle Fraternity Alumnus (ky 76), U Ky BSEE, Tau Beta Pi, Eta Kappa Nu, Kentucky Colonel
Words/phrases I avoid: basis, mitigate, leveraging, transitioning, impact (instead of affect/effect), facilitate, programmatic, problematic, issue (instead of problem), latency (instead of delay), dependency (instead of prerequisite), connectivity, usage & utilize (instead of use), downed, functionality, functional, power on, descore, alumni (instead of alumnus/alumna), the enterprise, methodology, nomenclature, form factor (instead of size or shape), competency, modality, provided(with), provision(ing), irregardless/irrespective, signage, colorized, pulsating, ideate
Reply With Quote
  #79   Spotlight this post!  
Unread 09-06-2011, 16:03
vexnewkid vexnewkid is offline
Registered User
no team
 
Join Date: Jun 2011
Location: United States
Posts: 1
vexnewkid is an unknown quantity at this point
Re: how to build a VEX programming module

Hi Guys,

I have an extremely cheap VEX robotics kit for sale. It includes the programming device. I am going off to school and don't need the kit anymore, and I know that maybe one you guys may need some parts for the competition.
Here's the link:

http://cgi.ebay.com/Vex-Robotics-Dua...#ht_500wt_1156

Thank you and enjoy!
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
Programming - Getting Started Mark McLeod Programming 80 16-04-2008 23:37
Programming for Vex robots Jeff K. Programming 4 13-11-2005 16:40
VEX Robotics vexrobotics FIRST Tech Challenge 8 30-03-2005 23:25
OCCRA Teams - where do you build? Phil 33 OCCRA 7 28-10-2004 21:41
build new programming (st.louis regional) nick_champ_2 Programming 21 23-02-2004 20:55


All times are GMT -5. The time now is 03:17.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi