Go to Post As Grandma used to say, "empirical data is better than no data at all." - dlavery [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 10-01-2012, 18:49
mayde's Avatar
mayde mayde is offline
Team Captain / Pirate Queen
AKA: Mayde Smith
FRC #2865 (Roboteknix)
Team Role: Leadership
 
Join Date: Jan 2010
Rookie Year: 2009
Location: Post Falls
Posts: 59
mayde is on a distinguished road
Send a message via MSN to mayde
Re: How long for planning??

Our team has a very specific approach to the planning and designing process.
In simplified terms, it looks something like this.

The day of kickoff, we come back to our school after watching the video and meet as a whole team and discuss ideas. We then split into groups of about 5 or 6 people that are predetermined by the captain (myself) and coach according to who will work well together and insuring that each team has at least one person capable of using solidworks.
During the following week, the teams each meet on whatever days they can and come up with a complete design for the robot including a strategy to accompany the shooter/scoring mechanism they've devised and use solidworks to model it. They also create a powerpoint presentation explaining the design and suggested strategy and on Friday night the entire team, all the mentors, and any parents and sponsors that are interested in attending come to a presentation where each team is introduced and reviews their proposed design.
The next Saturday morning the whole team meets again and we spend the whole day choosing which design suits our purpose the most and altering it until it's become finalized. The next week is spent on completing this design with every detail perfected.

I hope this helps. I personally like this system because is gives every student, senior and freshman alike, a chance to share their ideas with their teammates and in the long run more people feel like they've had an input on the design of the robot.
[/font][/font][/font][/font]
__________________

Surprise.

Roboteknix 2865;
2010 Spirit- Portland Autodesk Regional
2011 Safety Captain - Seattle Regional
2012 Team Captain- Cheney (Spokane) Regional
Reply With Quote
  #2   Spotlight this post!  
Unread 10-01-2012, 19:21
om23 om23 is offline
Registered User
AKA: Om Mahida
no team
Team Role: Alumni
 
Join Date: Jan 2010
Rookie Year: 2010
Location: Mount Laurel, NJ
Posts: 69
om23 is a jewel in the roughom23 is a jewel in the roughom23 is a jewel in the rough
Re: How long for planning??

Organization is the key to success.
Every year there's something different about the way the team is organized. Over the years, test out the best processes.
But first- you need to work on strategy: defense or offense- how to score, etc.
Then as a team come up with different ideas. The types of shooters, drive trains, etc.
Then- the team leaders (along with mentors) should get together one day decide the pros and cons of each and finalize a couple different choices (or you can have the entire team pick). Start building a couple prototypes to see how all your ideas work. Get the chassis design done ASAP.
^the planning of strategy and design should be done within the first couple days.
Then within the first 1.5 weeks test your prototypes and see what works the best for your strategy. Then finalize the designs and BUILT and get the robot to software ASAP!
Now this is only for building the actual robot, you still need to do a lot of other things such as awards, planning for competitions, marketing, etc.
__________________
College Student | "It won't fail because of me."
Reply With Quote
  #3   Spotlight this post!  
Unread 10-01-2012, 19:22
Dominator1619's Avatar
Dominator1619 Dominator1619 is offline
Registered User
FRC #0313 (Bionic Zebras)
Team Role: Coach
 
Join Date: Oct 2010
Rookie Year: 2002
Location: Westland, Michigan
Posts: 22
Dominator1619 is an unknown quantity at this point
Re: How long for planning??

For the past few years, because of being a team Ford FIRST team, we watch the kick-off with several team Ford First Teams. After that we have a group lunch, followed by a break down of the rules. After breaking into groups for the rules break down, we gather together and come up with viable strategies for that given game year. Sunday we take off due to religious reasons from several team members, but meet directly after school Monday morning. At that point, we review all the possible strategies, and choose a team strategy for that year. Over the next few day we sit down as a team and pool all of our ideas together, then go through each one, one at a time, and set a list of pros and cons for each idea. At that point, we chose our options for that given year and begin design. Week try to have our final design set by mid week one. By mid week two we typically have our frame built and that years given device prototyped. Once that device is perfected, construction begins on the actual device that will be on that robot. Typically by beginning to mid week 5, everything has been constructed and finished and we begin to work out all the kinks and do drive team testing. The last few days are usually spent getting the drive team practice with the robot. That being said, the more practice you can provide your drivers, the better off you'll be. A well driven robot that does nothing is almost always more effective than a poorly driven robot that does everything.
__________________
So where is this cake I was promised?
Reply With Quote
  #4   Spotlight this post!  
Unread 10-01-2012, 19:37
firemaster193's Avatar
firemaster193 firemaster193 is offline
Registered User
FRC #2130
 
Join Date: Jan 2010
Location: Bonners Ferry
Posts: 20
firemaster193 is an unknown quantity at this point
Re: How long for planning??

Planning really depends on the game and what your team is good at doing every year our team has been really strong in offense but feaseable in defense our planning time usually lasts from a week to 2 weeks it just depends on circumstances
Reply With Quote
  #5   Spotlight this post!  
Unread 10-01-2012, 21:41
krazyman1013's Avatar
krazyman1013 krazyman1013 is offline
Registered User
FRC #0701 (RoboVikes)
Team Role: Leadership
 
Join Date: Jan 2012
Rookie Year: 2008
Location: Vacaville, Ca
Posts: 28
krazyman1013 is an unknown quantity at this point
Re: How long for planning??

Its take my team about 4-5 days to plan our robot and at the same time we are building and welding our base frame. (use a general frame and adapt it to the game) don't dedicate your whole team to one thing, have several groups working on different things and then have a meeting at the end of every week to get everyone on the same level.
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 18:17.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi