|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
| Thread Tools | Rate Thread | Display Modes |
|
#16
|
||||
|
||||
|
Re: 2012 Team Update #1
They missed that clarification in the update. Ask on the Q&A for a definition of "fully supported".
|
|
#17
|
||||
|
||||
|
Re: 2012 Team Update #1
Quote:
So drive up and drop an arm on it and technically you're fully supported... For me this clarification just made the rule more unclear. |
|
#18
|
|||
|
|||
|
Re: 2012 Team Update #1
Does the fixed frame perimeter eliminate the possibility of an Archimedes Screw type of ball collection where the ball would enter the system by driving over it? I cannot really decide, but a fixed frame perimeter with ground clearance of 2-10 inches seems to make that impossible now.
|
|
#19
|
|||
|
|||
|
Re: 2012 Team Update #1
A Bridge will count as Balanced if it is 1) within 5° of horizontal and 2) any Robots touching it are fully supported by it.
or A Bridge will count as Balanced if it is (within 5° of horizontal and any Robots touching it are fully supported by it). The English breaks the other way. |
|
#20
|
|||
|
|||
|
Re: 2012 Team Update #1
Quote:
less pronouns please GDC? |
|
#21
|
||||
|
||||
|
Re: 2012 Team Update #1
Quote:
|
|
#22
|
||||
|
||||
|
Re: 2012 Team Update #1
Is it just me or did robots on the bridge during end game just become worth a whole lot more?
Quote:
Quote:
1 10 10 2 20 20 3 20 40 |
|
#23
|
|||||
|
|||||
|
Re: 2012 Team Update #1
Quote:
|
|
#24
|
|||||
|
|||||
|
Re: 2012 Team Update #1
Quote:
Here's the thread on the FIRST Forums http://forums.usfirst.org/showthread.php?t=18306 |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|