Go to Post A true team can only be formed by people who care about each other and that have a common goal... - keehun [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 11-01-2012, 22:55
R.Irick R.Irick is offline
Registered User
FRC #2346
 
Join Date: Jan 2012
Location: Kansas Cirt
Posts: 3
R.Irick is an unknown quantity at this point
Lightbulb How is your team pushing the bridge down?

Hey guys!

My FIRST team recently has brainstormed on ideas for how to lower the bridge so you can get on it. We've come up with a couple of ideas, including wedges, big arm that just moves out and pushes down, and some kinda of non-motorized peg wheel to catch it.

However, we've got a couple of questions that we're stuck on. It would help us if we knew the thickness of the bridge along with how much force is needed to move them.

With them being double hinged, it appears that you will need more energy to push it down, against the hinge that wants to right its self and the weight of the other side rising up. The rule book, from my reading and reading dosen't explain much on them.

Does anyone know of a palce to get that info? Also, for simply brainstorming ideas, how is your team planning to do this, and if not, why?

Good Luck with the Seson!
Reply With Quote
  #2   Spotlight this post!  
Unread 11-01-2012, 23:34
Ernst's Avatar
Ernst Ernst is offline
Ernst
AKA: Ernst
FRC #1732 (Hilltoppers)
Team Role: Mentor
 
Join Date: Dec 2011
Rookie Year: 2011
Location: Milwaukee, WI
Posts: 297
Ernst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond reputeErnst has a reputation beyond repute
Re: How is your team pushing the bridge down?

Check the Field Drawings for info on the dimensions of all of the field parts.
Reply With Quote
  #3   Spotlight this post!  
Unread 11-01-2012, 23:56
Garrett.d.w's Avatar
Garrett.d.w Garrett.d.w is offline
Build Lead
FRC #2733 (The Pigmice)
Team Role: Alumni
 
Join Date: Jul 2011
Rookie Year: 2010
Location: Portland
Posts: 318
Garrett.d.w is a splendid one to beholdGarrett.d.w is a splendid one to beholdGarrett.d.w is a splendid one to beholdGarrett.d.w is a splendid one to beholdGarrett.d.w is a splendid one to beholdGarrett.d.w is a splendid one to beholdGarrett.d.w is a splendid one to behold
Re: How is your team pushing the bridge down?

We built something similar once before. It has an axle that runs the length of the front of the robot. Several wheels (or rollers) are on said axle. The whole contraption is lowered in front of the robot by means of a hinge actuated by a window motor or pneumatic piston.

The thought behind this is to put wheels or a skid plate in front of the bumper to push the ramp down.

As far as the ease of tipping the ramps, the ones at kickoff (which I assume are stiffer) can be pushed down very easily if you attack it at the right angle. If you have the resources, build a bridge and then try a few different ideas by building them and driving/ pushing the kitbot around on it.

Good Luck
__________________
"A mind once stretched by a thought will never regain it's original dimensions."

Optimists think the glass is half full.
Pessimists think the glass is half empty.
Engineers realize it's twice as big as it needs to be.

Last edited by Garrett.d.w : 12-01-2012 at 00:01.
Reply With Quote
  #4   Spotlight this post!  
Unread 12-01-2012, 07:55
Phyrxes's Avatar
Phyrxes Phyrxes is offline
Has done the math, have you?
AKA: Dave Button
no team (No Team, Changed Schools)
Team Role: Teacher
 
Join Date: Dec 2007
Rookie Year: 2007
Location: Gainesville VA
Posts: 489
Phyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant futurePhyrxes has a brilliant future
Re: How is your team pushing the bridge down?

Make sure you consider the geometry of driving up and over the bridge when thinking about manipulator to push the bridge down. A bridge "level" should be a foot off the ground, while a bridge tipped the other way is two feet off the ground. Are you planning on pushing it down to drive over for yourself or do you also intended to be on the opposite side manipulating it for another bot on your alliance to drive up it?

If you build the team version of the bridge it should run you less than $150 in plywood, 2x4s, hinges and plastic sheet to simulate the actual bridge surface.

We put one together the other evening, it is heavy and it does take up a bunch of space.
__________________
Dave Button
Physics and Mathematics Teacher
Wakefield School
The Plains, VA

“Simplify and add lightness.”
― Colin Chapman, Team Lotus

Last edited by Phyrxes : 12-01-2012 at 08:10.
Reply With Quote
  #5   Spotlight this post!  
Unread 12-01-2012, 08:04
ThaineP
 
Posts: n/a
Re: How is your team pushing the bridge down?

I have an idea for a belt that runs vertically with flanges on it so when it runs in one direction it lowers the bridge and when run in the other direction raises it when pushed next to the bridge. The problem, though, is that it would be a bit on the fragile side and would be outside of the bumper zone.
Reply With Quote
  #6   Spotlight this post!  
Unread 12-01-2012, 09:12
Brandon Holley's Avatar
Brandon Holley Brandon Holley is offline
Chase perfection. Catch excellence.
AKA: Let's bring CD back to the way it used to be
FRC #0125 (NU-TRONs, Team #11 Alumni (GO MORT))
Team Role: Engineer
 
Join Date: Jan 2004
Rookie Year: 2001
Location: Boston, MA
Posts: 2,593
Brandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond repute
Send a message via AIM to Brandon Holley
Re: How is your team pushing the bridge down?

According to our calculations and field mock-up, you need 16 pounds of force applied at the very edge of the ramp to push it downward.

-Brando
__________________
MORT (Team 11) '01-'05 :
-2005 New Jersey Regional Chairman's Award Winners
-2013 MORT Hall of Fame Inductee

NUTRONs (Team 125) '05-???
2007 Boston Regional Winners
2008 & 2009 Boston Regional Driving Tomorrow's Technology Award
2010 Boston Regional Creativity Award
2011 Bayou Regional Finalists, Innovation in Control Award, Boston Regional Finalists, Industrial Design Award
2012 New York City Regional Winners, Boston Regional Finalists, IRI Mentor of the Year
2013 Orlando Regional Finalists, Industrial Design Award, Boston Regional Winners, Pine Tree Regional Finalists
2014 Rhode Island District Winners, Excellence in Engineering Award, Northeastern University District Winners, Industrial Design Award, Pine Tree District Chairman's Award, Pine Tree District Winners
2015 South Florida Regional Chairman's Award, NU District Winners, NEDCMP Industrial Design Award, Hopper Division Finalists, Hopper/Newton Gracious Professionalism Award
Reply With Quote
  #7   Spotlight this post!  
Unread 12-01-2012, 09:31
Ty Tremblay's Avatar
Ty Tremblay Ty Tremblay is offline
Robotics Engineer
FRC #0319 (Big Bad Bob)
Team Role: Mentor
 
Join Date: Feb 2006
Rookie Year: 2004
Location: Alton NH
Posts: 841
Ty Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond reputeTy Tremblay has a reputation beyond repute
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Brandon Holley View Post
According to our calculations and field mock-up, you need 16 pounds of force applied at the very edge of the ramp to push it downward.

-Brando
I talked to a guy at the Manchester Kickoff, and he said it was 11 pounds. I could be wrong though.
__________________
Reply With Quote
  #8   Spotlight this post!  
Unread 12-01-2012, 09:36
Siri's Avatar
Siri Siri is offline
Dare greatly
AKA: 1640 coach 2010-2014
FRC #2641 (PCCR; Refs & RIs)
Team Role: Coach
 
Join Date: Jan 2008
Rookie Year: 2007
Location: PA
Posts: 1,634
Siri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond repute
Send a message via ICQ to Siri
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Brandon Holley View Post
According to our calculations and field mock-up, you need 16 pounds of force applied at the very edge of the ramp to push it downward.

-Brando
I take it that's a directly downward force vector? Do you have your calculations? We're looking at driving at it with a 45deg angle plate (and our bridge isn't done yet).
__________________
Reply With Quote
  #9   Spotlight this post!  
Unread 12-01-2012, 09:47
Brandon Holley's Avatar
Brandon Holley Brandon Holley is offline
Chase perfection. Catch excellence.
AKA: Let's bring CD back to the way it used to be
FRC #0125 (NU-TRONs, Team #11 Alumni (GO MORT))
Team Role: Engineer
 
Join Date: Jan 2004
Rookie Year: 2001
Location: Boston, MA
Posts: 2,593
Brandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond repute
Send a message via AIM to Brandon Holley
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Ty Tremblay View Post
I talked to a guy at the Manchester Kickoff, and he said it was 11 pounds. I could be wrong though.
If there is empirical data from a Manchester field element I would tend to trust that more.


Quote:
Originally Posted by Siri View Post
I take it that's a directly downward force vector? Do you have your calculations? We're looking at driving at it with a 45deg angle plate (and our bridge isn't done yet).
I will gather the calculations and show them, they are quite simple.

We based them off of the youtube video on Bridges. They explain about using 2 batteries to test your own bridge to mimic the dynamics of the field.

-Brando
__________________
MORT (Team 11) '01-'05 :
-2005 New Jersey Regional Chairman's Award Winners
-2013 MORT Hall of Fame Inductee

NUTRONs (Team 125) '05-???
2007 Boston Regional Winners
2008 & 2009 Boston Regional Driving Tomorrow's Technology Award
2010 Boston Regional Creativity Award
2011 Bayou Regional Finalists, Innovation in Control Award, Boston Regional Finalists, Industrial Design Award
2012 New York City Regional Winners, Boston Regional Finalists, IRI Mentor of the Year
2013 Orlando Regional Finalists, Industrial Design Award, Boston Regional Winners, Pine Tree Regional Finalists
2014 Rhode Island District Winners, Excellence in Engineering Award, Northeastern University District Winners, Industrial Design Award, Pine Tree District Chairman's Award, Pine Tree District Winners
2015 South Florida Regional Chairman's Award, NU District Winners, NEDCMP Industrial Design Award, Hopper Division Finalists, Hopper/Newton Gracious Professionalism Award
Reply With Quote
  #10   Spotlight this post!  
Unread 12-01-2012, 10:24
longhorns1771's Avatar
longhorns1771 longhorns1771 is offline
Registered User
FRC #1771
 
Join Date: Jan 2012
Location: Georgia
Posts: 6
longhorns1771 is an unknown quantity at this point
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Ty Tremblay View Post
I talked to a guy at the Manchester Kickoff, and he said it was 11 pounds. I could be wrong though.
Any I dea ion how much the bridge actualy weight or that not of any relevance?
__________________
Longhorns!!
Reply With Quote
  #11   Spotlight this post!  
Unread 12-01-2012, 10:27
longhorns1771's Avatar
longhorns1771 longhorns1771 is offline
Registered User
FRC #1771
 
Join Date: Jan 2012
Location: Georgia
Posts: 6
longhorns1771 is an unknown quantity at this point
Cool Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Siri View Post
I take it that's a directly downward force vector? Do you have your calculations? We're looking at driving at it with a 45deg angle plate (and our bridge isn't done yet).
do you mind elaborating about driving at it with a 45deg angle plate?
__________________
Longhorns!!
Reply With Quote
  #12   Spotlight this post!  
Unread 12-01-2012, 10:31
The Lucas's Avatar
The Lucas The Lucas is offline
CaMOElot, it is a silly place
AKA: My First Name is really "The" (or Brian)
FRC #0365 (The Miracle Workerz); FRC#1495 (AGR); FRC#4342 (Demon)
Team Role: Mentor
 
Join Date: Mar 2002
Rookie Year: 2001
Location: Dela-Where?
Posts: 1,564
The Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond reputeThe Lucas has a reputation beyond repute
Send a message via AIM to The Lucas
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Brandon Holley View Post
If there is empirical data from a Manchester field element I would tend to trust that more

-Brando
I heard 18 lbs from a good source at the Manchester field. Whichever number you use, I suggest a significant factor of safety. I don't know how these hinges will vary or wear from event to event.
__________________
Electrical & Programming Mentor ---Team #365 "The Miracle Workerz"
Programming Mentor ---Team #4342 "Demon Robotics"
Founding Mentor --- Team #1495 Avon Grove High School
2007 CMP Chairman's Award - Thanks to all MOE members (and others) past and present who made it a reality.
Robot Inspector
"I don't think I'm ever more ''aware'' than I am right after I burn my thumb with a soldering iron"
Reply With Quote
  #13   Spotlight this post!  
Unread 12-01-2012, 10:45
EngiGirl1053 EngiGirl1053 is offline
Registered User
FRC #1053
 
Join Date: Jan 2011
Location: Canada
Posts: 4
EngiGirl1053 is an unknown quantity at this point
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Siri View Post
I take it that's a directly downward force vector? Do you have your calculations? We're looking at driving at it with a 45deg angle plate (and our bridge isn't done yet).
My team thought of doing this too, but because of the location of the bumpers, it isn't possible: the bumpers would have to be above the height of the brige (12") to be able to go at it with an angled plate, when their max height is 10". They get in the way, it can't be done.
Reply With Quote
  #14   Spotlight this post!  
Unread 12-01-2012, 11:18
Siri's Avatar
Siri Siri is offline
Dare greatly
AKA: 1640 coach 2010-2014
FRC #2641 (PCCR; Refs & RIs)
Team Role: Coach
 
Join Date: Jan 2008
Rookie Year: 2007
Location: PA
Posts: 1,634
Siri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond reputeSiri has a reputation beyond repute
Send a message via ICQ to Siri
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Brandon Holley View Post
I will gather the calculations and show them, they are quite simple.

We based them off of the youtube video on Bridges. They explain about using 2 batteries to test your own bridge to mimic the dynamics of the field.
Ah ok, I thought it was based on your bridge. I did the calcs off the video as well. We'll test on our bridge (when it gets done...). You're right, I think the next-best thing is Manchester data.

Quote:
Originally Posted by longhorns1771 View Post
do you mind elaborating about driving at it with a 45deg angle plate?
45deg is a semi-arbitrary starting point (which I think is probably incorrect). We're testing what happens when you tilt a plate that starts inside the bumper perimeter out to some angle and drive into the bridge. We're considering any time of active conveyance on the front as well, not sure without a bridge to test on.

Quote:
Originally Posted by EngiGirl1053 View Post
My team thought of doing this too, but because of the location of the bumpers, it isn't possible: the bumpers would have to be above the height of the brige (12") to be able to go at it with an angled plate, when their max height is 10". They get in the way, it can't be done.
Untrue. You need only to put the plate where the bumpers are not, i.e. 8" in from the nearest exterior vertexesm and ensure the plate doesn't run the bridge into the bumpers (again, 45deg is a pre-analysis & testing arbitrary initial guess)
__________________
Reply With Quote
  #15   Spotlight this post!  
Unread 12-01-2012, 13:16
Brandon Holley's Avatar
Brandon Holley Brandon Holley is offline
Chase perfection. Catch excellence.
AKA: Let's bring CD back to the way it used to be
FRC #0125 (NU-TRONs, Team #11 Alumni (GO MORT))
Team Role: Engineer
 
Join Date: Jan 2004
Rookie Year: 2001
Location: Boston, MA
Posts: 2,593
Brandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond repute
Send a message via AIM to Brandon Holley
Re: How is your team pushing the bridge down?

Quote:
Originally Posted by Siri View Post
Ah ok, I thought it was based on your bridge. I did the calcs off the video as well. We'll test on our bridge (when it gets done...). You're right, I think the next-best thing is Manchester data.
We have 3 bridges in our lab that were used at our local kickoff. Once I saw that video published by FIRST displaying how to test for matching dynamics, we tested ours. Based on the numbers FIRST provided in the video, we calculated 16 lbs, straight down, at the end of the ramp. Thats what we've been tweaking our bridges to mimic.

Somewhat related sidenote: I will almost guarantee that when you build your bridge it will require tweaking to mimic FIRSTs video.

-Brando
__________________
MORT (Team 11) '01-'05 :
-2005 New Jersey Regional Chairman's Award Winners
-2013 MORT Hall of Fame Inductee

NUTRONs (Team 125) '05-???
2007 Boston Regional Winners
2008 & 2009 Boston Regional Driving Tomorrow's Technology Award
2010 Boston Regional Creativity Award
2011 Bayou Regional Finalists, Innovation in Control Award, Boston Regional Finalists, Industrial Design Award
2012 New York City Regional Winners, Boston Regional Finalists, IRI Mentor of the Year
2013 Orlando Regional Finalists, Industrial Design Award, Boston Regional Winners, Pine Tree Regional Finalists
2014 Rhode Island District Winners, Excellence in Engineering Award, Northeastern University District Winners, Industrial Design Award, Pine Tree District Chairman's Award, Pine Tree District Winners
2015 South Florida Regional Chairman's Award, NU District Winners, NEDCMP Industrial Design Award, Hopper Division Finalists, Hopper/Newton Gracious Professionalism Award
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 13:36.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi