Go to Post Indianagineers! (n.: In-di-ae-nah-jih-nir: any resident of Gary, Indiana, or it's suburbs, who is trained in the use or design of machines or engines, or in other areas such as electrical or chemical technology) - dlavery [more]
Home
Go Back   Chief Delphi > Technical > Technical Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Closed Thread
 
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 15-01-2012, 11:16
Kevin Sevcik's Avatar
Kevin Sevcik Kevin Sevcik is offline
(Insert witty comment here)
FRC #0057 (The Leopards)
Team Role: Mentor
 
Join Date: Jun 2001
Rookie Year: 1998
Location: Houston, Texas
Posts: 3,709
Kevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond reputeKevin Sevcik has a reputation beyond repute
Send a message via AIM to Kevin Sevcik Send a message via Yahoo to Kevin Sevcik
Re: Banebots Motor Question

The Banebots P60 gearboxes should be perfectly fine for powering a shooter wheel. As Adam said, you start running into problems if you use them in large reductions driving high inertias with shock loads. The failure point is actually where the output shaft meets the final stage carrier plate. It's a "Double-D" shaft/hole connection that's highly prone to deforming and camming out under shock loads. A low reduction gearbox into a shooter wheel just isn't going to have this problem.

As for lead times, last year was obviously horrendous with 20 day lead times or more. BB is currently stating up to 6 day lead times on orders. I think the lead time gets bad because they have such a modular system and they build each gearbox to order.

PROTIP: If you need a P60 gearbox RIGHT NOW, order all the individual parts for it and assemble it yourself.

Last year at the height of the 25-30 day lead times, we ordered wheels and spare P60 parts from BB and they shipped in 2-3 days. So I'm pretty certain you could just order all the various parts you need and they'd ship out much much faster.
__________________
The difficult we do today; the impossible we do tomorrow. Miracles by appointment only.

Lone Star Regional Troubleshooter
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 02:12.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi