|
|
|
![]() |
|
|||||||
|
||||||||
![]() |
| Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||
|
|||
|
Yesterday's Update
As part of the Team Update yesterday - "The HoopsDrawing GE-12013, Basketball Hoop, has been updated to include Note #3." Referencing the drawings at:
http://www.usfirst.org/sites/default...icDrawings.pdf There is no note 3 added. Am I looking in the wrong place? Anyone know what note 3 is? Thanks, Glenn |
|
#2
|
|||
|
|||
|
Re: Yesterday's Update
I couldn't find the updated drawing either. Would have been nice to have a link to the drawing included in the Update.
Dr. Bob Chairman's Award is not about building the robot. Every team builds a robot. |
|
#3
|
|||||
|
|||||
|
Re: Yesterday's Update
Sometimes stuff doesn't get done on time...you might ask on the Q&A, or you might wait a day or two for the revised drawing to be posted
|
|
#4
|
||||||
|
||||||
|
Re: Yesterday's Update
It's there now:
3. Once the stock spring has been replaced, tighten the nut holding the spring in place until the end of the bolt is flush to the outside surface of the nut. |
![]() |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|