Go to Post Reach out to successful teams and ask them for help, rather than complain about them. I have never seen a successful team deny help to anyone. - OZ_341 [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 21-01-2012, 18:12
JakeOrtiz JakeOrtiz is offline
Registered User
FRC #0691
 
Join Date: Jan 2012
Location: California
Posts: 1
JakeOrtiz is an unknown quantity at this point
Bridge Assembly Confusion

So using the blueprints that FIRST gave us, we got confused when it came to making the "rails" that go along the ramp. According to the field set up videos, the rails are small, only about 2 inches in height. But the blueprints, Assembly Steps 4 and 5 [page 20 of the 2012 Team Drawings.pdf], show a rail (referred to as a "pinch guard") that is 26 inches tall, 14 inches above the ramp when it is level. Is there anything that we are missing? Have any other teams had this problem? What should we do?
Reply With Quote
  #2   Spotlight this post!  
Unread 21-01-2012, 22:46
skimoose's Avatar
skimoose skimoose is offline
Parent/Mentor/Engineer
AKA: Arthur Dutra
FRC #0228 (GUS)
Team Role: Electrical
 
Join Date: Jan 2005
Rookie Year: 2003
Location: Meriden, Connecticut
Posts: 568
skimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond reputeskimoose has a reputation beyond repute
Re: Bridge Assembly Confusion

Those pinch guards were probably added to keep students safe near practice ramps. If you want to be closer to true field ramps, I would omit these guards. Just keep everyone clear when the ramps are in use or when someone might step onto the ramp.
__________________

2009 CT Regional Motorola Quality Award
2010 VRC Connecticut Championship Winners & Amaze Award
2010 VRC Championship Divisional Energy Award
2010 WPI Regional Winner
2010 WPI Regional Engineering Inspiration Award
2011 WPI Regional Chairman's Award
2012 WPI Regional Finalists
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 07:32.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi