Go to Post Point is, there is no definite answer. This is FIRST, Whatever works well with your team is the best. - NelsonMichael [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
 
 
Thread Tools Rate Thread Display Modes
Prev Previous Post   Next Post Next
  #12   Spotlight this post!  
Unread 07-04-2012, 17:15
DampRobot's Avatar
DampRobot DampRobot is offline
Physics Major
AKA: Roger Romani
FRC #0100 (The Wildhats) and FRC#971 (Spartan Robotics)
Team Role: College Student
 
Join Date: Jan 2012
Rookie Year: 2010
Location: Stanford University
Posts: 1,277
DampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond repute
Re: The missing feature: A common thread

In my experience, fast fabrication correlates to high performance. It doesn't really matter if it's through a sponsor or the team simply has a lot of machines at their disposal, but being able to go from the design phase very quickly to the assembly phase seems extremely important.

Our team has a manual lathe and a CNC mill in our machine shop which, is not really comparable to the resources at the disposal of "powerhouse" teams. In order to have enough time to manufacture a practice and competition robot, we had to finish the detailed CAD by the Monday of week 2. For us, time is simply that much of an issue.

Contrasting this with 254 (for me, the local powerhouse team) reveals a large difference. Talking to mentor, I learned that they typically finished the CAD around week 3 or 4. This gives them approximately two to three times more time to prototype, strategize and design. It's hardly a surprise how dominant they were at SVR.

I don't think that this trend of designing until late and manufacturing fast is unique to the poofs. To me, being able to get parts fast allows for extra time to prototype and design for the "powerhouse" teams that "normal" teams don't have. Quick manufacturing turnaround, to me, makes all the difference.
__________________
The mind is not a vessel to be filled, but a fire to be lighted.

-Plutarch
Reply With Quote
 


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 19:41.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi