Unread 18-12-2012, 11:15
AdamHeard's Avatar
AdamHeard AdamHeard is offline
Lead Mentor
FRC #0973 (Greybots)
Team Role: Mentor
 
Join Date: Oct 2004
Rookie Year: 2004
Location: Atascadero
Posts: 5,508
AdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond repute
Send a message via AIM to AdamHeard
Re: A Simple Elevator

Quote:
Originally Posted by nnfuller View Post
After graduating I took some time off from robotics, however I will be home over winter break and will be helping mentor my team during their design phase. Over the years I have helped build many robots and systems, but I have never built a elevator/lift. My team is very capable but do not have access to high precision work. They have a small mill and a team member has his own lathe. What would the CD community suggest as a method for building a lift that would have been competitive in the 2011 game? Basically I do not think they have the machining ability to build 254/1114esque lift, however it would be nice to have a solution in my back pocket in case their early designs seek out something like this.

Thank you for your time.
How small a mill? We made a full 60" tall "254 style" elevator on a 14" travel knee mill.

It was actually pretty easy on the fabrication side.
  #2   Spotlight this post!  
Unread 18-12-2012, 11:25
nnfuller's Avatar
nnfuller nnfuller is offline
Registered User
AKA: Alumni
FRC #2733 (Pigmice)
 
Join Date: Jun 2008
Rookie Year: 2002
Location: USA, Oregon, Portland
Posts: 110
nnfuller is on a distinguished road
Re: A Simple Elevator

Quote:
How small a mill? We made a full 60" tall "254 style" elevator on a 14" travel knee mill.

It was actually pretty easy on the fabrication side.
It is a SMITHY CX-329
http://www.americanmachinetools.com/...op_milling.htm
Do you have any advice/documentation on your process? I guess my concern was with tolerances on a 254 style system. Had you built a version of this system before the build season?
__________________
  #3   Spotlight this post!  
Unread 18-12-2012, 11:38
AdamHeard's Avatar
AdamHeard AdamHeard is offline
Lead Mentor
FRC #0973 (Greybots)
Team Role: Mentor
 
Join Date: Oct 2004
Rookie Year: 2004
Location: Atascadero
Posts: 5,508
AdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond reputeAdamHeard has a reputation beyond repute
Send a message via AIM to AdamHeard
Re: A Simple Elevator

The tolerances aren't as critical as you would think. If someone knows how to use the mill, their tolerances are likely good enough.

Check out our 2011 prototype CAD (posted in my sig) to see the elevator. Where we did gussets, and a waterjet rack gear, you could do completely different. The overall layout and bearing setup is decently easy though.

We mill 12-14" sections at a time, and then scoot the part down and rezoro off the last hole drilled by just shoving the drill bit in the hole (more specifically, we just leave the drill bit in the last hole drilled, open the vice, full travel X, reclamp vice). We call it "table jumping". We do it for any tubing longer than table travel.
  #4   Spotlight this post!  
Unread 18-12-2012, 11:40
Brandon Holley's Avatar
Brandon Holley Brandon Holley is offline
Chase perfection. Catch excellence.
AKA: Let's bring CD back to the way it used to be
FRC #0125 (NU-TRONs, Team #11 Alumni (GO MORT))
Team Role: Engineer
 
Join Date: Jan 2004
Rookie Year: 2001
Location: Boston, MA
Posts: 2,593
Brandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond reputeBrandon Holley has a reputation beyond repute
Send a message via AIM to Brandon Holley
Re: A Simple Elevator

Also- designing something with built in adjustability can help get around *almost* any machine tolerance issue. Design approach is crucial.

-Brando
__________________
MORT (Team 11) '01-'05 :
-2005 New Jersey Regional Chairman's Award Winners
-2013 MORT Hall of Fame Inductee

NUTRONs (Team 125) '05-???
2007 Boston Regional Winners
2008 & 2009 Boston Regional Driving Tomorrow's Technology Award
2010 Boston Regional Creativity Award
2011 Bayou Regional Finalists, Innovation in Control Award, Boston Regional Finalists, Industrial Design Award
2012 New York City Regional Winners, Boston Regional Finalists, IRI Mentor of the Year
2013 Orlando Regional Finalists, Industrial Design Award, Boston Regional Winners, Pine Tree Regional Finalists
2014 Rhode Island District Winners, Excellence in Engineering Award, Northeastern University District Winners, Industrial Design Award, Pine Tree District Chairman's Award, Pine Tree District Winners
2015 South Florida Regional Chairman's Award, NU District Winners, NEDCMP Industrial Design Award, Hopper Division Finalists, Hopper/Newton Gracious Professionalism Award
  #5   Spotlight this post!  
Unread 18-12-2012, 11:43
nnfuller's Avatar
nnfuller nnfuller is offline
Registered User
AKA: Alumni
FRC #2733 (Pigmice)
 
Join Date: Jun 2008
Rookie Year: 2002
Location: USA, Oregon, Portland
Posts: 110
nnfuller is on a distinguished road
Re: A Simple Elevator

Quote:
Originally Posted by Brandon Holley View Post
Also- designing something with built in adjustability can help get around *almost* any machine tolerance issue. Design approach is crucial.
Do you have any examples of an adjustable system like you mentioned? I would be worried about things like adjustment screws loosening, but perhaps others have had success here?
__________________
  #6   Spotlight this post!  
Unread 18-12-2012, 11:51
JamesCH95's Avatar
JamesCH95 JamesCH95 is offline
Hardcore Dork
AKA: JCH
FRC #0095 (The Grasshoppers)
Team Role: Engineer
 
Join Date: Dec 2004
Rookie Year: 2001
Location: Enfield, NH
Posts: 1,859
JamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond reputeJamesCH95 has a reputation beyond repute
Re: A Simple Elevator

Quote:
Originally Posted by nnfuller View Post
Do you have any examples of an adjustable system like you mentioned? I would be worried about things like adjustment screws loosening, but perhaps others have had success here?
There are many fastener locking solutions out there, but steer clear of split lock washers. I prefer nylock nuts and Nord lockwashers, personally. There is always safety wire and castle nuts for the supremely cautious.

You can always brute-force it and re-tighten critical fasteners after every match.
__________________
Theory is a nice place, I'd like to go there one day, I hear everything works there.

Maturity is knowing you were an idiot, common sense is trying to not be an idiot, wisdom is knowing that you will still be an idiot.
  #7   Spotlight this post!  
Unread 18-12-2012, 12:35
pfreivald's Avatar
pfreivald pfreivald is offline
Registered User
AKA: Patrick Freivald
FRC #1551 (The Grapes of Wrath)
Team Role: Mentor
 
Join Date: Jan 2007
Rookie Year: 2001
Location: Naples, NY
Posts: 2,296
pfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond repute
Re: A Simple Elevator

Bosch Rexroth extruded aluminum with Ecoslide carriages served as our (winch-driven) cascade lift in Overdrive and our (lead-screw-driven) robot lifter in Breakaway.

http://www13.boschrexroth-us.com/Fra...t.aspx?units=1

It was almost shameful how little manufacturing capability we needed to create either device, and both worked exactly as we designed them to. (Mind you, we've learned some about design in both cases, and would make them even better now -- but still might use these products.)
__________________
Patrick Freivald -- Mentor
Team 1551
"The Grapes of Wrath"
Bausch & Lomb, PTC Corporation, and Naples High School

I write books, too!
  #8   Spotlight this post!  
Unread 18-12-2012, 12:51
jwfoss jwfoss is offline
Chasing Elegant Simplicity
AKA: Justin Foss
FRC #0558 (Elm City Robo Squad)
Team Role: Mentor
 
Join Date: Aug 2006
Rookie Year: 2003
Location: New Haven, CT
Posts: 592
jwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond reputejwfoss has a reputation beyond repute
Re: A Simple Elevator

In 2011 2168 used 80-20 for our lift and it work out fairly well. With the resources we had it made the most sense at the time. Moving forward we will likely look into something like what 67 did in 2011 (Look under the 2011 Build Season image in this Gallery)
__________________
2003-2006 | FRC 0176 | Aces High - Student
2007-2010 | FRC 0229 | Division by Zero - Mentor in Training
2011-2013 | FRC 2168 | Aluminum Falcons - Mechanical Mentor
2013-20xx | FRC 0558 | Elm City Robo Squad - Mechanical Mentor
  #9   Spotlight this post!  
Unread 18-12-2012, 23:20
ttldomination's Avatar
ttldomination ttldomination is offline
Sunny
no team
Team Role: Mentor
 
Join Date: Mar 2007
Rookie Year: 2007
Location: Roanoke, TX
Posts: 2,066
ttldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond reputettldomination has a reputation beyond repute
Re: A Simple Elevator

Quote:
Originally Posted by pfreivald View Post
Bosch Rexroth extruded aluminum with Ecoslide carriages served as our (winch-driven) cascade lift in Overdrive and our (lead-screw-driven) robot lifter in Breakaway.

http://www13.boschrexroth-us.com/Fra...t.aspx?units=1

It was almost shameful how little manufacturing capability we needed to create either device, and both worked exactly as we designed them to. (Mind you, we've learned some about design in both cases, and would make them even better now -- but still might use these products.)
How was the durability of the pads on this? Did you notice that the tower was swaying when all the way up high?

When we made our lift with 8020, it was fast and came together nicely. However, it was heavy. One issue that was critical was that when the tower was at its maximum height, the tower would sway. We found that this was because of the play that would develop in the plastic slides (in all fairness, those slides are meant for compression loads). In short, would not do again.

One solution that I found nice was use the iGus products. If I had to do it again, I'd have to track down exactly the types to use, but IIRC, 1771 simply used some super-light c-channel lined with the iGus products. Worked like a charm.

- Sunny G.
__________________
1261: 2007-2012
1648: 2013-2014
5283: 2015
  #10   Spotlight this post!  
Unread 19-12-2012, 01:25
DampRobot's Avatar
DampRobot DampRobot is offline
Physics Major
AKA: Roger Romani
FRC #0100 (The Wildhats) and FRC#971 (Spartan Robotics)
Team Role: College Student
 
Join Date: Jan 2012
Rookie Year: 2010
Location: Stanford University
Posts: 1,277
DampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond reputeDampRobot has a reputation beyond repute
Re: A Simple Elevator

Quote:
Originally Posted by ttldomination View Post
How was the durability of the pads on this? Did you notice that the tower was swaying when all the way up high?

When we made our lift with 8020, it was fast and came together nicely. However, it was heavy. One issue that was critical was that when the tower was at its maximum height, the tower would sway. We found that this was because of the play that would develop in the plastic slides (in all fairness, those slides are meant for compression loads). In short, would not do again.

One solution that I found nice was use the iGus products. If I had to do it again, I'd have to track down exactly the types to use, but IIRC, 1771 simply used some super-light c-channel lined with the iGus products. Worked like a charm.

- Sunny G.
We did an 80-20 lift in 2008, and in many regards, it was our best robot in recent memory. (We almost made it to division finals, I believe.)

The first stage was 2x1 80-20 with the standard nylon slides. It was slightly lightened (the back half of the 80-20 was replaced with welded on c-channel), but very similar to a system you could put together in an afternoon from regular 80-20. The second stage used v-shaped rollers that fitted into the grooves in the back of the 80-20.

While that system was fairly simple to design and execute, I wouldn't go with it again. First, it was very heavy, even with the lightening on the first stage. Second, it was poorly counter weighted. And third, the nylon sliders introduced a lot of friction into the system. You really have to pull on it to get it to lift up, and it took two CIMs to raise. I never noticed any sway, but then again, we haven't competed with it in a while.

For the OP: 80-20 is a good solution if you don't want to do bearings riding on the outside of 2x1 tubing (like 254 did in 2007 and 2011). However, don't count yourself out of that design too soon. Almost any design can be modified to fit your machining abilities, so take a look at 973's CAD to see how much machining is really required.
__________________
The mind is not a vessel to be filled, but a fire to be lighted.

-Plutarch
  #11   Spotlight this post!  
Unread 19-12-2012, 03:27
luciano841 luciano841 is offline
Mentor
FRC #0841 (The Biomechs)
Team Role: Mentor
 
Join Date: Mar 2004
Rookie Year: 2003
Location: Richmond
Posts: 10
luciano841 is an unknown quantity at this point
Re: A Simple Elevator

Team 841 built an elevator system with a drill press and chop saw in 2011. The elevator uses 2x1 square tubing as the outer section, 2x1 c-channel for the center and a rolling device in the center (consisting of 2x1 square tubing connected with flat bars).This elevator design worked very well for us and will definitely use it again if the need arises.

Everything was measured with a tape measure, center punched by hand and then drilled with a 1/4 drill bit.
We noticed that there needs to be enough room for the parts to move within the system, make sure that the bearings do not apply too much tension to the moving components.

Here is a link of our design with 254 and 973.
http://www.chiefdelphi.com/forums/sh...77#post1085150
  #12   Spotlight this post!  
Unread 19-12-2012, 09:11
pfreivald's Avatar
pfreivald pfreivald is offline
Registered User
AKA: Patrick Freivald
FRC #1551 (The Grapes of Wrath)
Team Role: Mentor
 
Join Date: Jan 2007
Rookie Year: 2001
Location: Naples, NY
Posts: 2,296
pfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond repute
Re: A Simple Elevator

Quote:
Originally Posted by ttldomination View Post
How was the durability of the pads on this? Did you notice that the tower was swaying when all the way up high?
The ecoslide pads are beastly, and hold together very, very well -- I had forgotten that we didn't even use the carriages on Shiela, just the pads (screwed into the second stage of the lift, inserted into the first stage, which was the Bosch stuff). The elevator we made consisted of two rails spaced almost to the sides of the robot, stiffened with a few small crossbeams made of 1/2" L aluminum. It didn't sway.

http://www.team1551.org/Sheila2_400x600.jpg

Our robot lift in Breakaway used the ecoslide carriage and lifted our whole robot no problem over and over again -- it didn't sway because it had little weight up top: it was just used to lift a hook, and then drew down to lift the whole robot.
Attached Thumbnails
Click image for larger version

Name:	Ecoslides.PNG
Views:	152
Size:	287.7 KB
ID:	13328  Click image for larger version

Name:	Claw2.PNG
Views:	187
Size:	350.1 KB
ID:	13329  
__________________
Patrick Freivald -- Mentor
Team 1551
"The Grapes of Wrath"
Bausch & Lomb, PTC Corporation, and Naples High School

I write books, too!

Last edited by pfreivald : 19-12-2012 at 09:22.
  #13   Spotlight this post!  
Unread 19-12-2012, 11:28
nnfuller's Avatar
nnfuller nnfuller is offline
Registered User
AKA: Alumni
FRC #2733 (Pigmice)
 
Join Date: Jun 2008
Rookie Year: 2002
Location: USA, Oregon, Portland
Posts: 110
nnfuller is on a distinguished road
Re: A Simple Elevator

Thank you everyone for their input. Our team used 80/20 sliders for our minibot deployment in 2011, and we swore them off after that. So I have tried to mock up a lift I think we could build image below:

Specs:
  • Two stage Lift with the primary towers built out of 1x2 1/16 wall Aluminum
  • Second stage uses 1x2 1/8th wall C stock
  • First stage uses bearings in bearing blocks designed to be shimmed out in order to get a precise fit to control front to back motion and the side to side motion is controlled by Delrin slides riveted to the top of the towers and bottom of the first stage.
  • The second Stage slides are milled Delrin inserts. These can be milled and sanded until they slides cleanly in a test piece of C channel.
  • All of the gusset plates are .050 Aluminum sheet with 3/16 Rivets
  • Top black brace is made of 1/4in plywood.
  • Since this is a mock up the tower is not adequately braced, but for now im interested in critique of overall design.
__________________
  #14   Spotlight this post!  
Unread 21-12-2012, 21:31
Adam.garcia Adam.garcia is offline
Design Mentor
FRC #0004 (Team 4 Element)
Team Role: Mentor
 
Join Date: Aug 2009
Rookie Year: 1997
Location: High Tech LA
Posts: 133
Adam.garcia is just really niceAdam.garcia is just really niceAdam.garcia is just really niceAdam.garcia is just really nice
Re: A Simple Elevator

Quote:
Originally Posted by nnfuller View Post
Thank you everyone for their input. Our team used 80/20 sliders for our minibot deployment in 2011, and we swore them off after that. So I have tried to mock up a lift I think we could build image below:

Specs:
  • Two stage Lift with the primary towers built out of 1x2 1/16 wall Aluminum
  • Second stage uses 1x2 1/8th wall C stock
  • First stage uses bearings in bearing blocks designed to be shimmed out in order to get a precise fit to control front to back motion and the side to side motion is controlled by Delrin slides riveted to the top of the towers and bottom of the first stage.
  • The second Stage slides are milled Delrin inserts. These can be milled and sanded until they slides cleanly in a test piece of C channel.
  • All of the gusset plates are .050 Aluminum sheet with 3/16 Rivets
  • Top black brace is made of 1/4in plywood.
  • Since this is a mock up the tower is not adequately braced, but for now im interested in critique of overall design.
I am still learning the design of the elevator system myself, but I think you need, built onto the top of that second stage, a mount for a pulley which will route the steel cable (or other means of wire) throughout your assembly. Also, that black plate in the back is going to be secured to the cable, so make sure that it is adequately strong, as it is going to be taking a lot of force.
__________________
“The object of education is to teach us to love what is beautiful.”

“Never discourage anyone who continually makes progress, no matter how slow.”
  #15   Spotlight this post!  
Unread 21-12-2012, 21:40
MichaelBick MichaelBick is offline
Registered User
FRC #1836 (MilkenKnights)
Team Role: Alumni
 
Join Date: Oct 2011
Rookie Year: 2010
Location: Los Angeles
Posts: 734
MichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant futureMichaelBick has a brilliant future
Re: A Simple Elevator

Quote:
Originally Posted by Adam.garcia View Post
I am still learning the design of the elevator system myself, but I think you need, built onto the top of that second stage, a mount for a pulley which will route the steel cable (or other means of wire) throughout your assembly. Also, that black plate in the back is going to be secured to the cable, so make sure that it is adequately strong, as it is going to be taking a lot of force.
There's multiple ways to rig an elevator. Pulley and cable is only one. If you do cascaded rigging you can actually run wire rope, chain, belt, or a rack and pinion. Look at the discussion here: http://www.chiefdelphi.com/forums/sh...d.php?t=110011
__________________
Team 1836 - The Milken Knights
2013 LA Regional Champions with 1717 and 973
2012 LA Regional Finalists with 294 and 973
To follow Team 1836 on Facebook, go to http://www.facebook.com/MilkenKnights
To go to our website, go to http://milkenknights.com/index.html
Closed Thread


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 00:20.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi