|
|
|
![]() |
|
|||||||
|
||||||||
|
|
Thread Tools | Rate Thread | Display Modes |
|
#1
|
|||||
|
|||||
|
2363 System Integration testing
Here is a short video of some system integration testing of Genome Epsilon.
Minor problems seen in this video: - Oversized weld beads at pickup arm throat cause disks to catch. Weld beads need filed away. - Hopper out of round at the top causes bad stacking of top disks and misfire during rapid firing. Hopper to be replaced with different cylinder. - Backlash in shafting that controls pickup arm angle. Not a critical problem. Need to troubleshoot source. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|