Quote:
Originally Posted by daniel_dsouza
After prototyping mechanisms (along with their detailed CAD), their compatibility is guaranteed by using standardized mounting techniques (gussets, brackets, axles, etc). Tolerances are handled in CAD, troubleshooted on the prototype, and built into the final.
|
We use standardized mounts like you, so they mount just fine, but I'm curious as to how you make sure they actually interact correctly. For instance, our feeder looked fine in the CAD, but when we tried it it flipped the frisbee almost every time, which turned out to be impossible to fix without rebuilding the feeder entirely.
Quote:
Originally Posted by Chris is me
Our head mentor is currently (and probably will be for some time) our lead CAD coordinator, making sure all of the subsystems work well together before manufacturing... or after, if we have to. I think teams need one or two people to integrate everything successfully in CAD, with good communication skills so they can talk about the design with prototypers and subsystem CADers.
|
I'd love to know how your head mentor goes about coordinating CAD. None of our mentors are mechanical engineers (actually, none are engineers at all), so the students coordinate the CAD as a group of about 5. Does he set requirements/specifications before the CAD is started, or does he let them start and then facilitate discussion to avoid conflicts?