Go to Post As we were lying the robot down to work on it "CAD me like one of your french robots" - 1uan [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rating: Thread Rating: 18 votes, 4.78 average. Display Modes
  #271   Spotlight this post!  
Unread 12-05-2013, 17:21
Grim Tuesday's Avatar
Grim Tuesday Grim Tuesday is offline
Registered User
AKA: Simon Bohn
FRC #0639 (Code Red)
Team Role: Alumni
 
Join Date: Jan 2010
Rookie Year: 2010
Location: Baltimore MD (JHU)
Posts: 1,607
Grim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond reputeGrim Tuesday has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

I think the best argument against extending the season is this:

If it were extended, there are two options each team must choose.
  1. Meet as often as possible/keep their regular build schedule that they used in the 6 week season but extend it for however many weeks possible. This would give that team the maximum competetive advantage and you can be sure that teams like 469 and 1114 will use this option.
  2. Meet less frequently to avoid burnout. I spoke with our teacher advisor and asked him what he would do if the build season were extended. His response was "we'd meet three days less a week" (we currently meet 6 days a week). His logic was that we would need to help students, mentors and himself avoid burnout and lowering grades, and it is completely valid logic.

So in the end, if you're a team worried about mentor or student burnout maybe your team [or portions of your team - like your school administration] aren't quite as invested in the competitive aspect of FRC, you'll end up meeting less frequently or be forced back into a 6 week season.

We are currently forced into a 6 week hard limited build season with maybe 1 or 2 build nights after bag. We have to meet off site if we want to meet more frequently. Again, this is because our sponsoring teacher isn't terribly invested in the competitive aspect of the season. He knows that we can make an eliminations worthy robot with our current build schedule and does not see a huge increase in the impact of the program on students when the team wins or when they don't. So we are simply unable to meet as often as some of the students and mentors would like after bag.

Maybe this is an isolated case but I suspect it effects some other teams as well. It may not be their teachers but it could be their head mentor, their schools, their administration, their sponsor, their funding, the willingness of their students, their students parents, etc... that stops a team from meeting as much as their most dedicated members (who might be any of the aforementioned groups capable of blocking meetings!) may wish, and it is out of the control of those members.

I don't think we want to be increasing the gap between the elite teams and 'the pack'.

Last edited by Grim Tuesday : 12-05-2013 at 17:27.
Reply With Quote
  #272   Spotlight this post!  
Unread 12-05-2013, 18:35
Tetraman's Avatar
Tetraman Tetraman is offline
FIRST on my mind
AKA: Evan Raitt
no team
Team Role: Alumni
 
Join Date: Mar 2006
Rookie Year: 2002
Location: Manchester, NH
Posts: 1,322
Tetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by Ed Law View Post
Tell me what you will do with your team, not what you think other teams you don't know anything about may do. Otherwise this discussion here is meaningless.
174's Current build schedule:

We have split the team between "crews", and each crew meets at different days throughout the week. The days we have for work is Tuesday, Thursday and Friday after-school, 2:30pm till 8pm or later depending on the need. Saturday work sessions are from 9am till 4pm or later depending. We meet all of these days throughout the entire build season. We also have a group of students and mentors who work of site. These students/mentors work very long nights, typically around 11pm, on Tuesdays, Thursdays and other days the extra work is needed.

How we would deal with open build:

Rinse and repeat, only skipping a few days before our competition weeks. While we could deal with the additional school work hours, the off-site team (which is the biggest core of our build students and mentors) will be beyond burnt out.

We have already had a team discussion about mentor burn out before this thread was started, and I can say that I am very scared for our mentor sustainability if additional build time was given. That said, we can adapt - there are problems with our system as it is and working to fix it.
__________________
"For every great theory about design, there is a better and contradictory theory about design. And don't let the irony of that escape you."
Reply With Quote
  #273   Spotlight this post!  
Unread 12-05-2013, 18:55
plnyyanks's Avatar
plnyyanks plnyyanks is offline
Data wins arguments.
AKA: Phil Lopreiato
FRC #1124 (The ÜberBots), FRC #2900 (The Mighty Penguins)
Team Role: College Student
 
Join Date: Apr 2010
Rookie Year: 2010
Location: NYC/Washington, DC
Posts: 1,114
plnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond reputeplnyyanks has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by Ed Law View Post
Tell me what you will do with your team, not what you think other teams you don't know anything about may do. Otherwise this discussion here is meaningless.
1124's current build schedule:

We meet Monday-Thursday 6:30-9, Saturday 8-5, Sunday 12-5
This schedule runs from kickoff until we're done competing. The only changes happen when our school is on break (when we meet more often and for longer) and the Wed-Thurs after bag/ship day (which we take off to recover). Team members show up as they're needed and are pretty much free to make their own schedules and can choose their own time commitment; most members are there 3-4 days a week, but can be there more or less at their own discretion.

If we had an open build season, what would change? Probably nothing, or very little. We're already at the ceiling of the required commitment, and our existing schedule already burns us out (you should have seen me after CTR this year - I was an exhausted mess, but I digress). If anything, our stress levels would drop significantly. Not having to build a second robot would reduce budgetary and emotional strain. We'd get more practice time with the actual robot.

Now, I don't know if an open build holds all the answers, but I see some problems it would reduce (however, not being a mentor, I can't speak to all the unintended side effects that might arise, nor how it would affect mentors specifically). But with strict regard to 1124's meeting schedule, I think not much would change from the way it is now.
__________________
Phil Lopreiato - "It's a hardware problem"
Team 1124 (2010 - 2013), Team 1418 (2014), Team 2900 (2016)
FRC Notebook The Blue Alliance for Android
Reply With Quote
  #274   Spotlight this post!  
Unread 12-05-2013, 19:26
dtengineering's Avatar
dtengineering dtengineering is offline
Teaching Teachers to Teach Tech
AKA: Jason Brett
no team (British Columbia FRC teams)
Team Role: Mentor
 
Join Date: Jan 2005
Rookie Year: 2004
Location: Vancouver, BC
Posts: 1,833
dtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond reputedtengineering has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

Well, apparently not everyone is "burned out"...

A) You're still surfing Chief Delphi

B) 90+ teams have signed up for IRI

While the title of the thread is relating the six week build period to mentor burnout, I think Jim's posts have really helped me refocus my opinions on the six week build period to consider the teams with lower performing machines... many of whom are not on CD.

I'll go so far as to say that whether the build period is six weeks, or 52 weeks, some teams will continue to put in more time than others, and some mentors will continue to feel "burned out".

But if we look at how altering the six week build period might give higher performing teams more time to mentor and assist lower performing teams, and focus on making everyone better... well, the best antidote to burnout is success!

Jason
Reply With Quote
  #275   Spotlight this post!  
Unread 12-05-2013, 21:36
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,825
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

I have one question for EVERYBODY who is advocating an open build season. And I do mean EVERYBODY. Let's see who can answer it before they get to the answer.

Let's assume for a minute, that an FRC build season allows everyone an equal time to build their robot (give or take a few hours due to time zones, etc), as it is set up now. I think we can agree on that--setting aside the practice robots, which of course any team can build in the time between bag and ship, or build during build and play with in that timeframe. Now, let's extend the build season--no bagging, no tagging, just show up with your robot. You are in a Week 2 event--your first. You are competing against a team from Alaska, a team from Hawaii, and 2-3 teams from Mexico, and the event is in Arizona. Which of those teams is at a DISADVANTAGE in terms of time in an open build season, given that nobody bothers to build a practice robot when they have their competition robot in their ship to work on?




I would bet you even money that the team from Alaska and the team from Hawaii had to crate their robots and ship them before the Week 1 events just to make sure that they arrived at their destination on time. The Mexico teams would not need to ship, presumably (though they might choose to if the distance was far enough), so they have no disadvantage over travel time.

In other words, I think the real purpose of the bag deadline is to help the international/long-distance traveling teams, of which there are quite a few, have even time with the rest of us. Remember, they have to ship their robots. Most teams don't. Compete in HI or Israel instead of building a practice robot, and I think you'll agree that maybe it would be a good idea to have everybody at the event bag up their robot at about the same time.



So, here is a proposal: Extend the build deadline ONLY to the date that teams who ship their robots to Week 1, or whatever the first week someone will need to ship to an event is, will need to have their robots in the crate. FIRST presumably knows, or can be informed, of that sort of date, give or take a day in either direction. Now, I'd say that MI, MAR, and Israel would be exempt, except that MI and MAR would then proceed to kick the rest of our butts even worse than before (sorry, guys, I like the district concept, but could you ease off on the rest of us until we get our own? ), and I'd rather not have only one area exempt.


Speaking of which, someone asked about how those opposed to this change stood on the district model. I was not opposed to the district model, per se. I was opposed to certain elements, namely the secrecy and the fact that other areas who had wanted to do something like this for a while were not allowed to do something similar (now the former is a moot point and the latter is more of a "they're going that way, but foot-dragging is popular").

However, the removal of a bag day is something that I don't see happening. Not yet. Extended build time, or an access period, sure. Complete removal? Give it a couple of years after the extension and access period type of changes to see how that goes over--just like the districts took some time to get rolling, and now there are 2, with rumors of anywhere between 1 and 5 more being explored for 1-3 years down the road.
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk

Reply With Quote
  #276   Spotlight this post!  
Unread 12-05-2013, 21:40
ehfeinberg's Avatar
ehfeinberg ehfeinberg is offline
Registered User
AKA: Evan
FRC #0449 (Blair Robot Project)
Team Role: Alumni
 
Join Date: Feb 2012
Rookie Year: 2011
Location: Silver Spring, MD
Posts: 232
ehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant future
Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by EricH View Post
So, here is a proposal: Extend the build deadline ONLY to the date that teams who ship their robots to Week 1, or whatever the first week someone will need to ship to an event is, will need to have their robots in the crate.
Isn't that when our stop build day already is?
__________________
“They’ve done studies, you know. 60 percent of the time, it works every time.” — Brian Fantana
"You miss 100% of the shots you don't take." - Wayne Gretzky
"Simplicity is the ultimate form of sophistication" - Leonardo da Vinci

Last edited by ehfeinberg : 12-05-2013 at 21:41. Reason: Needed to make it more clear that I was providing humor
Reply With Quote
  #277   Spotlight this post!  
Unread 12-05-2013, 21:47
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,825
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by ehfeinberg View Post
Isn't that when our stop build day already is?
When it was, you mean? Or did you get the memo that you don't have to put the robot in the crate and ship it to week 1 anymore?

Actually, I don't quite think so. You could probably sneak a couple more days in for a close event. That's part of why I'm suggesting that bag day be whenever the first team that needs to ship to an event has to be in the crate to make it there. Whether that's Week 1, or Week 6/7! Imagine what havoc a variable-between-years bag date could cause!
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk

Reply With Quote
  #278   Spotlight this post!  
Unread 12-05-2013, 21:52
ehfeinberg's Avatar
ehfeinberg ehfeinberg is offline
Registered User
AKA: Evan
FRC #0449 (Blair Robot Project)
Team Role: Alumni
 
Join Date: Feb 2012
Rookie Year: 2011
Location: Silver Spring, MD
Posts: 232
ehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant futureehfeinberg has a brilliant future
Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by EricH View Post
When it was, you mean? Or did you get the memo that you don't have to put the robot in the crate and ship it to week 1 anymore?

Actually, I don't quite think so. You could probably sneak a couple more days in for a close event. That's part of why I'm suggesting that bag day be whenever the first team that needs to ship to an event has to be in the crate to make it there. Whether that's Week 1, or Week 6/7! Imagine what havoc a variable-between-years bag date could cause!
Lets ask 359 how many days ahead they have to ship their robot for a competition in the states. I bet if you figure out when they would have to ship their robot for a week 1 competition, it would be the day or two after stop build day. Almost as if FIRST did that on purpose.
__________________
“They’ve done studies, you know. 60 percent of the time, it works every time.” — Brian Fantana
"You miss 100% of the shots you don't take." - Wayne Gretzky
"Simplicity is the ultimate form of sophistication" - Leonardo da Vinci
Reply With Quote
  #279   Spotlight this post!  
Unread 12-05-2013, 23:42
Squillo Squillo is offline
Registered User
AKA: Cynthia Hannah-White
FRC #2465 (Kauaibots)
Team Role: Mentor
 
Join Date: Feb 2011
Rookie Year: 2010
Location: Kauai, Hawaii
Posts: 154
Squillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant futureSquillo has a brilliant future
Re: The 6 Week Build Season and 'Mentor Burnout'

I'm sorry I have to admit that I haven't read this entire thread, so maybe I've missed this part of the discussion. But it seems to me that one of the biggest "field-unequalizers" is the extra time that teams have to work on their competition bot, when they attend multiple competitions. Some of the teams we compete against have the resources to attend two or three regionals; we can't raise the $30,000 or so (maybe more) extra it would cost to attend an additional regional (we have to fly everywhere).

Now don't just say we should get out there and raise more money. We are in a small, poor rural community and are doing our best to try to expand our fundraising using the internet and other innovative ideas.

Even setting aside the extra robot driving time, competition practice, and the learning and motivating experiences of competitions, a team that can attend 2 or 3 regionals gets many extra days to work on their robot. By the time they get to their 3rd regional or Champs, they may have had the equivalent of an extra week or more of build/improve time. By being able to afford the extra entry fees and travel costs, they are "buying" more time with their competition bot unbagged.

Is this fair? Is there any way to mitigate it? Could teams that are attending only one competition get an extra "unbagged" day at their (only) competition, kind of like the extra hours given for the 2-day events? Has anyone suggested that?

For that matter, as we go to more districts, we may want to look at giving some advantage to teams that can't compete in more than one pre-champs event, to compensate for all the benefits of multiple competitions. More building time, more practice time, or something.

Oh, and for the record, I think that limiting the build time MORE than it is currently (e.g., leaving the 6-week build, removing the withholding allowance or cutting off firmware operability after SBD) would just result in even MORE inoperable robots, disheartened participants and other icky stuff. Bad idea (IMHO).
Reply With Quote
  #280   Spotlight this post!  
Unread 13-05-2013, 07:48
Tetraman's Avatar
Tetraman Tetraman is offline
FIRST on my mind
AKA: Evan Raitt
no team
Team Role: Alumni
 
Join Date: Mar 2006
Rookie Year: 2002
Location: Manchester, NH
Posts: 1,322
Tetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond reputeTetraman has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by Squillo View Post
Is this fair? Is there any way to mitigate it? Could teams that are attending only one competition get an extra "unbagged" day at their (only) competition, kind of like the extra hours given for the 2-day events? Has anyone suggested that?
I think it's fair as it is. I know what you mean, I would have liked an extra day back when we chose to only play one event. But that was a week 1 event, so it gives an uneven advantage against everyone else at their week 1 event too.
__________________
"For every great theory about design, there is a better and contradictory theory about design. And don't let the irony of that escape you."
Reply With Quote
  #281   Spotlight this post!  
Unread 13-05-2013, 09:20
pfreivald's Avatar
pfreivald pfreivald is offline
Registered User
AKA: Patrick Freivald
FRC #1551 (The Grapes of Wrath)
Team Role: Mentor
 
Join Date: Jan 2007
Rookie Year: 2001
Location: Naples, NY
Posts: 2,304
pfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond reputepfreivald has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

As things have moved in the direction of "what would *your* team do", I'd like to state for the record the school rules require that any time any part of the team meets, the coach (that would be me) is required to be there... So it doesn't matter if it's the programming team only and I know nothing about programming, or if other students and mentors want to work with their groups in shifts, or a group wants to get together and make buttons when I'd rather be writing or reading or resting or doing yard work; if they're there, I have to be there. Every. Single. Minute. First in the door, last to leave.

Perhaps this is one of the reasons why I look at the blessing of the withholding allowance (without which our robot would not have done nearly as well as it did this year) with a certain amount of seething, maniacal hatred, whereas others see it as nothing more than increased opportunity...

------------------

So, that's a side note. What I meant to post was this:

What this discussion comes down to is, "what is the purpose of extending the build season?" And follow-up questions should be, "are there other ways to fulfill those purposes?" Pros and cons, priority charts, etc, etc could be made, storms could be brained, data could be collected, and multiple solutions to perceived problems could be presented.

I'm not naive enough to presume that any group of this size will come to full agreement, but if we all got to thinking about what the perceived problems are, and what the possible solutions to those problems are, then we wouldn't be going round and round about extending build -- because I don't think we're even to the point where many agree on what the build extension is meant to accomplish, much less the negative side effects such as mentor burnout.

For example, when it comes to those teams that build nothing of use, I think there are a lot of things that can be done to help them become better... The bot in a box, where teams leave kickoff with a functioning drive train, is a fantastic resource, and any kickoff areas that are not currently doing this should absolutely be doing so, starting next year. If you start with a drive train wired up with a control system on day one, that gives you six full weeks to make some kind of useful manipulator... and if that's not enough time, then I don't see how eight or ten or twelve weeks will be, because whatever your problems are, they're much bigger and more critical than time. And thus, extending the build season is not a viable solution to this problem--and that means that arguments about do-nothing robots aren't good arguments for extending the build season.

On the other hand, when it comes to elite teams spending unnecessary money on practice robots and expedited shipping, I think extending the build season is a much more viable solution to these problems -- and indeed, I don't see any other way to make practice robots and expedited shipping unnecessary (though I'm opposed to doing it anyway).

...but if we can't agree on what the intended pros are, we aren't even at the place where we can discuss whether the cons are worth it.
__________________
Patrick Freivald -- Mentor
Team 1551
"The Grapes of Wrath"
Bausch & Lomb, PTC Corporation, and Naples High School

I write books, too!
Reply With Quote
  #282   Spotlight this post!  
Unread 14-05-2013, 01:28
sanddrag sanddrag is offline
On to my 16th year in FRC
FRC #0696 (Circuit Breakers)
Team Role: Teacher
 
Join Date: Jul 2002
Rookie Year: 2002
Location: Glendale, CA
Posts: 8,519
sanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond reputesanddrag has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

I'll add one more personal tidbit about why we should not extend the build season, and maybe that will help some of you understand why many of us are against it.

My profession is a full time high-school teacher, teaching 5 classes with about 150 students total. I also like to help with mentoring a Lego robotics team at a local elementary school one day per week for much of the school year. I am also a Tech Leader for the school district which has about 6-8 meetings per year. Along with the teaching job, I am often wearing the hat of computer technician, machine maintenance technician, machinist, welder, procurement specialist, high altitude balloon chaser, and now auto mechanic and detailer (all associated with the teacher job).

In the fall and in the spring, I am a professor at the local community college two nights a week. This conveniently falls just before and just after the FIRST build season (by a matter of a couple days). Post-bag (like the day after) and before and during competition season, I'm teaching in a second job two nights a week. I already turned down teaching another class at both the high school and at the college, because I want the time for FIRST.

As a college professor, I make about $52/hr. As a teacher, even with the additional college class, I already don't make enough to afford a house in the area I work. Doing FIRST Robotics, I make about $1 an hour (stipend), but I do it because I want to, not for the money. I've already turned down a 20% pay increase at the high school (to do another class there) and $52/hr for about 4 hours a week to do another class at the college. So, you could say my future ability to own my own home has been hampered by my commitment to FIRST Robotics. Participating in FIRST Robotics costs me money. Lots of it. Even if I flipped burgers for the time I spent doing FIRST Robotics, I'd be at least $5000/year more wealthy. I don't necessarily mind because I love doing it, but let's be realistic here. To extend the build season any more, I would no longer be able to teach the one college class I do, which would cost me about $3500/yr, not to mention the mental and physical toll it would take. I'd like to retire someday.

There's only so much one person can give. Everything I do, I like to do well. I never like to give a half-hearted effort at anything. If I do it, I'm all in. There's no cutting back time in any of it to balance it all. Not in my world. If I can't do something well, I don't do it at all. The problem becomes that there are only so many hours in each week, month, and year.

I wasn't going to mention this to avoid starting any rumors, but I feel it's relevant so I will. At the Inland Empire regional, Frank Merrick spent a while talking to my team in our pit, and one of the questions he asked was "What would you think of a longer build season?" to which I replied "No! Please don't! We want to see our families!" I hope he heard me. Of course my students were all for a longer build season. I guess that's why we have teachers like me to set them straight.

Anyhow, I bet my case is not all that unique.
__________________
Teacher/Engineer/Machinist - Team 696 Circuit Breakers, 2011 - Present
Mentor/Engineer/Machinist, Team 968 RAWC, 2007-2010
Technical Mentor, Team 696 Circuit Breakers, 2005-2007
Student Mechanical Leader and Driver, Team 696 Circuit Breakers, 2002-2004

Last edited by sanddrag : 14-05-2013 at 01:30.
Reply With Quote
  #283   Spotlight this post!  
Unread 14-05-2013, 01:51
Ian Curtis Ian Curtis is offline
Best Available Data
FRC #1778 (Chill Out!)
Team Role: Engineer
 
Join Date: Feb 2005
Rookie Year: 2004
Location: Puget Sound
Posts: 2,521
Ian Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond reputeIan Curtis has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by sanddrag View Post
I'll add one more personal tidbit about why we should not extend the build season, and maybe that will help some of you understand why many of us are against it.
I am a big fan of the extended build season because I am reasonably confident I will spend an equal amount and in all likelihood less time working on the robot. What's the more efficient way to study, a 10 hour cram session right before the exam or 5 2 hour sessions spread out over the week?

Quote:
"No! Please don't! We want to see our families!" I hope he heard me. Of course my students were all for a longer build season. I guess that's why we have teachers like me to set them straight.
The people in favor of an extended season I've talked with about this outside of this thread feel exactly the same way. We want to see our friends and families. Spreading the build season out over more time will let us put in as many hours without disappearing from our social lives (or least let us go home and take a nap occasionally).

I think there are very few people that want an extended build season so that they can put in more time. With the witholding allowance, FIRST basically gives you a permit to go nuts working for the whole competition season as is.
__________________
CHILL OUT! | Aero Stability & Control Engineer
Adam Savage's Obsessions (TED Talk) (Part 2)
It is much easier to call someone else a genius than admit to yourself that you are lazy. - Dave Gingery
Reply With Quote
  #284   Spotlight this post!  
Unread 14-05-2013, 01:56
Navid Shafa Navid Shafa is offline
FIRST Hiatus/Retired?
no team
Team Role: Alumni
 
Join Date: Oct 2007
Rookie Year: 2007
Location: Seattle, WA
Posts: 1,525
Navid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond reputeNavid Shafa has a reputation beyond repute
Thumbs up Re: The 6 Week Build Season and 'Mentor Burnout'

Quote:
Originally Posted by sanddrag View Post
I'll add one more personal tidbit about why we should not extend the build season, and maybe that will help some of you understand why many of us are against it.

My profession is a full time high-school teacher, teaching 5 classes with about 150 students total. I also like to help with mentoring a Lego robotics team at a local elementary school one day per week for much of the school year. I am also a Tech Leader for the school district which has about 6-8 meetings per year. Along with the teaching job, I am often wearing the hat of computer technician, machine maintenance technician, machinist, welder, procurement specialist, high altitude balloon chaser, and now auto mechanic and detailer (all associated with the teacher job).

In the fall and in the spring, I am a professor at the local community college two nights a week. This conveniently falls just before and just after the FIRST build season (by a matter of a couple days). Post-bag (like the day after) and before and during competition season, I'm teaching in a second job two nights a week. I already turned down teaching another class at both the high school and at the college, because I want the time for FIRST.

As a college professor, I make about $52/hr. As a teacher, even with the additional college class, I already don't make enough to afford a house in the area I work. Doing FIRST Robotics, I make about $1 an hour (stipend), but I do it because I want to, not for the money. I've already turned down a 20% pay increase at the high school (to do another class there) and $52/hr for about 4 hours a week to do another class at the college. So, you could say my future ability to own my own home has been hampered by my commitment to FIRST Robotics. Participating in FIRST Robotics costs me money. Lots of it. Even if I flipped burgers for the time I spent doing FIRST Robotics, I'd be at least $5000/year more wealthy. I don't necessarily mind because I love doing it, but let's be realistic here. To extend the build season any more, I would no longer be able to teach the one college class I do, which would cost me about $3500/yr, not to mention the mental and physical toll it would take. I'd like to retire someday.

There's only so much one person can give. Everything I do, I like to do well. I never like to give a half-hearted effort at anything. If I do it, I'm all in. There's no cutting back time in any of it to balance it all. Not in my world. If I can't do something well, I don't do it at all. The problem becomes that there are only so many hours in each week, month, and year.

I wasn't going to mention this to avoid starting any rumors, but I feel it's relevant so I will. At the Inland Empire regional, Frank Merrick spent a while talking to my team in our pit, and one of the questions he asked was "What would you think of a longer build season?" to which I replied "No! Please don't! We want to see our families!" I hope he heard me. Of course my students were all for a longer build season. I guess that's why we have teachers like me to set them straight.

Anyhow, I bet my case is not all that unique.
This post is likely the single most compelling anecdote in the entire thread. It would be hard for anyone to argue against it...


Kudos to Sanddrag for all his hard work!
__________________
2015 & 2016 Fantasy FIRST Champions [Rotten Fruit Alliance]
Elgin Clock Award Winners: '13, '15, '16

Team 1983 | Alumnus, Former Mentor| Team_ 360 | Former Coach | Team 5803 | Former Mentor

"Once a Skunk, Always a Skunk"

Founding Member
Reply With Quote
  #285   Spotlight this post!  
Unread 14-05-2013, 02:26
waialua359's Avatar
waialua359 waialua359 is offline
Mentor
AKA: Glenn
FRC #0359 (Hawaiian Kids)
Team Role: Mentor
 
Join Date: Apr 2003
Rookie Year: 2000
Location: Waialua, HI
Posts: 3,316
waialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond reputewaialua359 has a reputation beyond repute
Re: The 6 Week Build Season and 'Mentor Burnout'

Participating in FIRST has forced me to stay at my part-time (second job) for almost 24 years and counting.
**would've quit a long time ago**
__________________

2016 Hawaii Regional #1 seed, IDesign, Safety Award
2016 NY Tech Valley Regional Champions, #1 seed, Innovation in Controls Award
2016 Lake Superior Regional Champions, #1 seed, Quality Award, Dean's List
2015 FRC Worlds-Carver Division Champions
2015 Hawaii Regional Champions, #1 seed.
2015 Australia Regional Champions, #2 seed, Engineering Excellence Award
2015 Inland Empire Regional Champions, #1 seed, Industrial Design Award
2014 OZARK Mountain Brawl Champions, #1 seed.
2014 Hawaii Regional Champions, #1 seed, UL Safety Award
2014 Dallas Regional Champions, #1 seed, Engineering Excellence Award
2014 Northern Lights Regional Champions, #1 seed, Entrepreneurship Award
2013 Championship Dean's List Winner
2013 Utah Regional Champion, #1 seed, KP&B Award, Deans List
2013 Boilermaker Regional Champion, #1 seed, Motorola Quality Award
2012 Lone Star Regional Champion, #1 seed, Motorola Quality Award
2012 Hawaii Regional Champions #1 seed, Motorola Quality Award
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 08:21.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi