Go to Post A wise man told me a few nights ago, that it is important to own up to all your mistakes, so that others can see you doing that and wont deny and try to hide their own. - Josh Hambright [more]
Home
Go Back   Chief Delphi > FIRST > General Forum
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rate Thread Display Modes
  #16   Spotlight this post!  
Unread 12-06-2013, 08:22
akoscielski3's Avatar
akoscielski3 akoscielski3 is offline
Mentor (1114), Alumni (772)
AKA: Aaron Koscielski
FRC #1114 (Simbotics)
Team Role: Mentor
 
Join Date: Jul 2010
Rookie Year: 2006
Location: LaSalle, Ontario, Canada
Posts: 1,066
akoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond reputeakoscielski3 has a reputation beyond repute
Re: Robotics Workspace Floorplan

Quote:
Originally Posted by mman1506 View Post
The extrusion has a T-slot profile very similar to 80-20. They were installed with the arms so they are likely sold by a safety guarding company. You could probably do the same thing with any T-slot extrusion.

They are Motoman HP6 robotic arms equipped with a resistance spot welder. The arm's head position is programmed using normal Cartesian coordinates (X,Y,Z) just like any other CNC machine. We also have the cage installed around our plasma cutter.
What would the robotic arms be used for in a highschool robotics room? Or is this a class for the hogh school programming classes?

American high schools have so much more then here in Canada. Im jealous, but at the same time wondering why you need to have all the extras, especially when your government has no money... But I don't know
__________________
Hall of Fame Team 1114 Simbotics
2013-Present
Host of Simbot Solidworks Series
Team 772 Sabre Bytes
2010-2013

Dean's List Finalist 2013 Waterloo Regional
Reply With Quote
  #17   Spotlight this post!  
Unread 12-06-2013, 09:05
Cory's Avatar
Cory Cory is offline
Registered User
AKA: Cory McBride
FRC #0254 (The Cheesy Poofs)
Team Role: Engineer
 
Join Date: May 2002
Rookie Year: 2001
Location: Redwood City, CA
Posts: 6,812
Cory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond reputeCory has a reputation beyond repute
Send a message via AIM to Cory
Re: Robotics Workspace Floorplan

Quote:
Originally Posted by akoscielski3 View Post
What would the robotic arms be used for in a highschool robotics room? Or is this a class for the hogh school programming classes?

American high schools have so much more then here in Canada. Im jealous, but at the same time wondering why you need to have all the extras, especially when your government has no money... But I don't know
Most public high schools in the US have nothing or almost nothing when it comes to shop facilities, at least on the west coast.
__________________
2001-2004: Team 100
2006-Present: Team 254
Reply With Quote
  #18   Spotlight this post!  
Unread 12-06-2013, 09:22
mman1506's Avatar
mman1506 mman1506 is offline
Focusing on Combat Robots!
AKA: Marcus Quintilian
no team (WARP7)
Team Role: Alumni
 
Join Date: Mar 2012
Rookie Year: 2012
Location: Toronto
Posts: 805
mman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond repute
Re: Robotics Workspace Floorplan

Quote:
Originally Posted by akoscielski3 View Post
What would the robotic arms be used for in a highschool robotics room? Or is this a class for the hogh school programming classes?

American high schools have so much more then here in Canada. Im jealous, but at the same time wondering why you need to have all the extras, especially when your government has no money... But I don't know
They are used in our 11 and 12 robotics class. They spend most of there time sword fighting and playing checkers. Unfortunately they are highly proprietary making them a pain to program and we cannot afford to break anything.

We are a public school in Toronto, Canada. The arms were graciously donated to us (there's a rumour that it was in someone's will). We are the main robotics school in the district so we get a fairly large amount of funding but not every robotics program in are district gets adequate funding (cough..1310). We will be running them during a open shop day next year if you want to check them out.
__________________
2014-2015: FRC 865 Warp7 Team Captain
2016: FRC 865 Mentor

2017: Free Agent Mentor, Inspector
Reply With Quote
  #19   Spotlight this post!  
Unread 19-06-2013, 08:25
DanUeda DanUeda is offline
Registered User
FRC #0321 (RoboLancers)
Team Role: Coach
 
Join Date: Jun 2013
Rookie Year: 2008
Location: Pennsylvania
Posts: 4
DanUeda is an unknown quantity at this point
Re: Robotics Workspace Floorplan

We get zero funding from public sources and we are a public school. All of our funding has come from extreme efforts by our students, parents, and community. In a big fundraising push last year before worlds, we raised $39k in 7 days. Our goal for this new shop is $200k.

Referring back to another post that Daisy made a couple months ago, we used to be a team that cried about our lack of funding, until we decided to get proactive. There are definitely teams that are handed the money without much effort, but if we can make it happen in a city that is facing major budget problems, anyone can.

But still, we probably won't go with robotic arms. I really am just looking for recommendations for machines, storage, tools, space layout, safety, etc.
Reply With Quote
  #20   Spotlight this post!  
Unread 19-06-2013, 18:21
EricH's Avatar
EricH EricH is offline
New year, new team
FRC #1197 (Torbots)
Team Role: Engineer
 
Join Date: Jan 2005
Rookie Year: 2003
Location: SoCal
Posts: 19,813
EricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond reputeEricH has a reputation beyond repute
Re: Robotics Workspace Floorplan

Quote:
Originally Posted by DanUeda View Post
But still, we probably won't go with robotic arms. I really am just looking for recommendations for machines, storage, tools, space layout, safety, etc.
Start by figuring out what you have and are taking with you rather than getting rid of, and how you're going to fit that in with room to access and work around it. Then add in your half-field, and other areas you want to have.



I would HIGHLY suggest getting a "paper scale" model put together. What I mean by that is, you take a piece of paper and turn it into a scale drawing of the room, maybe something on the order of 1" on paper = 1' in real life. Then you make cutouts of your toolboxes, large tools, old robots, and probably a couple of "humans" at the same scale. Arrange the cutouts on the drawing to see how stuff fits in, "lock" the plan when you find one that works, and you're ready to move.
__________________
Past teams:
2003-2007: FRC0330 BeachBots
2008: FRC1135 Shmoebotics
2012: FRC4046 Schroedinger's Dragons

"Rockets are tricky..."--Elon Musk

Reply With Quote
  #21   Spotlight this post!  
Unread 20-06-2013, 02:14
CENTURION's Avatar
CENTURION CENTURION is offline
King of unreasonable designs
AKA: Evan the Shop Princess
FRC #1306 (BadgerBOTS)
Team Role: Mentor
 
Join Date: May 2010
Rookie Year: 2009
Location: Madison, WI
Posts: 278
CENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant futureCENTURION has a brilliant future
Re: Robotics Workspace Floorplan

Quote:
Originally Posted by EricH View Post
I would HIGHLY suggest getting a "paper scale" model put together. What I mean by that is, you take a piece of paper and turn it into a scale drawing of the room, maybe something on the order of 1" on paper = 1' in real life. Then you make cutouts of your toolboxes, large tools, old robots, and probably a couple of "humans" at the same scale. Arrange the cutouts on the drawing to see how stuff fits in, "lock" the plan when you find one that works, and you're ready to move.
This is exactly the way to do it. Have scale paper cutouts of your machine's work envelopes (including space for the operator!) too.
__________________
FRC #1306 - BadgerBOTS - Mechanical/Machining/Safety/Marketing Mentor
FTC #6806 - Ratchet Robotics - Head/Founding Mentor
2010 - Wisconsin Regional Chairman's Award Winner - Wisconsin Regional Quarter-finalist - Curie Division #5 Seed, Quarter-finalist
2011 - Wisconsin Regional Innovation in Control Award Winner - Wisconsin Regional Quarter-finalist
2012 - Wisconsin Regional Engineering Inspiration Award Winner - Wisconsin Regional Semi-finalist
2013 - Wisconsin Regional Chairman's Award Winner


Reply With Quote
  #22   Spotlight this post!  
Unread 20-06-2013, 13:29
KrazyCarl92's Avatar
KrazyCarl92 KrazyCarl92 is offline
Registered User
AKA: Carl Springli
FRC #5811 (The BONDS)(EWCP)
Team Role: Mentor
 
Join Date: Jan 2010
Rookie Year: 2010
Location: Dayton, OH
Posts: 521
KrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond reputeKrazyCarl92 has a reputation beyond repute
Re: Robotics Workspace Floorplan

I've attached a picture of Team 20's machine shop, which we share with the school, where most of our machining takes place throughout the season. Missing from the image are a table to the left with 3 small table top belt sanders, 2 manual lathes just to the left of the black door that never see use (they are not well taken care of), and a large band saw just adjacent to where the picture is being taken. Also barely missing from the image to the right is a table with 2 or 3 CNC machines. We use one of the mills occasionally. Between those, what is seen in the picture, and our materials closet, we are able to fit this all in space about the size of a classroom. The ceiling is quite a bit taller than a normal classroom, but the dimensions are rather close.

In the picture we have a 3-axis bridge port mill front and center, a work table with underneath storage to right of it, and a drill press behind it. We have a rather nice manual lathe that we use for most lathe work in the back right corner. In the back left corner we have a welding table and the appropriate exhaust setup.

This is just an example of a shop set up that works for us and can reasonably fit within the space of a classroom. There is also a woodshop in another part of the school that has table saws, more band saws, another drill press, and a break. It's important to think critically about what machines will actually see use. We use our band saw, drill press, manual lathe, belt sanders, and bridge port mill frequently. Less frequently we use our break or CNC mills. We bend aluminum, lexan, and sometimes steel on the break. We have made poor use of the CNC mills in the past (only using them for bumper mounting brackets of all things until last year), but we are starting to change that.

From my experience, I would definitely suggest a nice band saw, drill press, and mill along with 2 small table top belt sanders. Add a lathe, break, and/or CNC mills as your manufacturing requirements and experience expand. It is important to understand machine upkeep to protect investments. Look for good value, but at the same time you often get what you pay for unless you find really good deals.
Attached Thumbnails
Click image for larger version

Name:	photo.JPG
Views:	90
Size:	1.75 MB
ID:	15009  
__________________
[2017-present] FRC 0020 - The Rocketeers
[2016] FRC 5811 - BONDS Robotics
[2010-2015] FRC 0020 - The Rocketeers

Last edited by KrazyCarl92 : 20-06-2013 at 21:47.
Reply With Quote
  #23   Spotlight this post!  
Unread 20-06-2013, 13:59
mman1506's Avatar
mman1506 mman1506 is offline
Focusing on Combat Robots!
AKA: Marcus Quintilian
no team (WARP7)
Team Role: Alumni
 
Join Date: Mar 2012
Rookie Year: 2012
Location: Toronto
Posts: 805
mman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond reputemman1506 has a reputation beyond repute
Re: Robotics Workspace Floorplan

Quote:
Originally Posted by DanUeda View Post
But still, we probably won't go with robotic arms. I really am just looking for recommendations for machines, storage, tools, space layout, safety, etc.
Sorry, I didn't mean to diverge the thread. I was recommending the aluminum extrusion machining envelopes that we used to surround the arms. It makes everything look very safe and professional.
__________________
2014-2015: FRC 865 Warp7 Team Captain
2016: FRC 865 Mentor

2017: Free Agent Mentor, Inspector
Reply With Quote
  #24   Spotlight this post!  
Unread 27-06-2013, 15:50
DanUeda DanUeda is offline
Registered User
FRC #0321 (RoboLancers)
Team Role: Coach
 
Join Date: Jun 2013
Rookie Year: 2008
Location: Pennsylvania
Posts: 4
DanUeda is an unknown quantity at this point
Re: Robotics Workspace Floorplan

Awesome suggestions Carl!
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 12:13.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi