Go to Post A clean pit is a happy pit, a clean pit is a controlled pit, a clean pit is a safe pit. - DjAlamose [more]
Home
Go Back   Chief Delphi > Competition > Team Organization
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
 
Thread Tools Rating: Thread Rating: 4 votes, 5.00 average. Display Modes
  #1   Spotlight this post!  
Unread 18-09-2013, 00:19
|DELTA|'s Avatar
|DELTA| |DELTA| is offline
Unregistered, CAD Junkie, Machinist
FRC #0997 (Spartan Robotics)
Team Role: CAD
 
Join Date: Dec 2012
Rookie Year: 2011
Location: Black Hole, Oregon
Posts: 40
|DELTA| is an unknown quantity at this point
Re: Pit Design and the Pit-In-A-Box

The objects so far included are:

5-tier shelving unit (2)
4ft. Comecial Folding Table. (2)
Floor matt Tile pieces (cut to proper shape)
Programmable, chainable adhesive LED rope lights.
Spray Paint. (team colors)
2 in. diameter pvc tubing (34 ft. at least)
Two 2-in diameter T-joints
Two 2-in diameter elbow joints
Your Team's Banner.
Team color-compatable or clear rope/string
Two Folding chairs.

I will post the cost that we paid for our materials as soon as I can. It was very low though.
__________________
|DELTA|
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 10:34.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi