Go to Post Just wear your safety glasses. They can be stylish, too! - Eugenia Gabrielov [more]
Home
Go Back   Chief Delphi > ChiefDelphi.com Website > Extra Discussion
CD-Media   CD-Spy  
portal register members calendar search Today's Posts Mark Forums Read FAQ rules

 
Reply
Thread Tools Rate Thread Display Modes
  #1   Spotlight this post!  
Unread 09-10-2013, 09:59
C_Morgan C_Morgan is offline
Lead Mentor
AKA: Chris
FRC #0862 (Lightning Robotics)
Team Role: Leadership
 
Join Date: Apr 2012
Rookie Year: 2007
Location: Farmington Hills, MI
Posts: 6
C_Morgan is an unknown quantity at this point
paper: FRC862: Lightning Robotics Build Season Breakdown

Thread created automatically to discuss a document in CD-Media.

FRC862: Lightning Robotics Build Season Breakdown by C_Morgan
Reply With Quote
  #2   Spotlight this post!  
Unread 09-10-2013, 14:27
D.Allred's Avatar
D.Allred D.Allred is online now
Registered User
FRC #4451 (Rat Rod Robotics)
Team Role: Mentor
 
Join Date: Jun 2009
Rookie Year: 2009
Location: Greenville, SC
Posts: 207
D.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond reputeD.Allred has a reputation beyond repute
Re: paper: FRC862: Lightning Robotics Build Season Breakdown

Chris,
Thanks for sharing your schedule. It's good to compare task durations with other FRC teams.

Does 2013 revision 2 represent the actual activity dates or your 2013 pre-season plan? Did you miss any key milestones if this only represented your plan?

We finished our 2013 robot on time, but missed several interim milestones. In the end, it was not a significant impact, but we would have preferred more practice time before bag day.

Thanks,
David
Reply With Quote
  #3   Spotlight this post!  
Unread 09-10-2013, 15:36
C_Morgan C_Morgan is offline
Lead Mentor
AKA: Chris
FRC #0862 (Lightning Robotics)
Team Role: Leadership
 
Join Date: Apr 2012
Rookie Year: 2007
Location: Farmington Hills, MI
Posts: 6
C_Morgan is an unknown quantity at this point
Re: paper: FRC862: Lightning Robotics Build Season Breakdown

Hello David,

Rev 2 was simply the plan for the build season. It does not take into account slipped milestones. That is the one area that we need to work better on documenting.

I can say for certain that we spent much more time on prototyping and concept selection for 2013 then planned. Our 2nd PRACTICE BOT was the most completed of the past few years.

I will offer that it really helps having a PRACTICE CHASSIS. It allowed our PROGRAMMING TEAM to really work to refine the control and optimize the gear shifting algorithm (1st multi-speed trans in team history).

In addition, we also spent significantly more time in the CAD environment to ensure component placement, fit, etc. We have a release process for drawings to the fabrication group, and the fabricators work very hard to build parts to spec (at least those that need it). While I think the process can be better, the important part is that the students learned the value of the design tools and process. The flip side is the diminished time to build and validate caused some challenges downstream.

I cannot emphasize enough the importance of leaving your programming team some time with the hardware, as well as having the possibility of testing on an actual field mock-up to work out the mechanics. Our field elements and bumper stack-up were a bit short (collector deck needed to be adjusted downward), which resulted in the addition of a passive drop-down flap after our 1st qualification match during Week #1 of Kettering. Only then did we arrive at the results we had hoped for.

Like anything it remains a work in progress.
__________________
Team 862: Lightning Robotics
Strategy & Scouting Mentor Lead (2013)
Lead Mentor (2010 - 2013)

Last edited by C_Morgan : 10-10-2013 at 08:14. Reason: clarified field element + bumper gap issue
Reply With Quote
Reply


Thread Tools
Display Modes Rate This Thread
Rate This Thread:

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump


All times are GMT -5. The time now is 22:05.

The Chief Delphi Forums are sponsored by Innovation First International, Inc.


Powered by vBulletin® Version 3.6.4
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.
Copyright © Chief Delphi