Re: Build Season Schedule
Our build season plan is based on 1114's, note that the one I'm posting is not our final schedule for build season, it's still being changed but hopefully it gives you an idea of how to plan your season.
days 1-4: brainstorming, what do you want your robot to do? How do you want your robot to do it? These are the two most important questions that should drive your entire brainstorming process. day 5: design freeze days 5-8: prototyping, electrical layout on drive-base days 5-14: build drivetrain, programmer begin coding for drive train days 8-14: robot controls, finish drivetrain day 15: begin autonomous coding days 8-21: mechanism construction, programmers finish drive train code days 22-28: mechanism integration with drive base, wiring day 29: robot finished days 29-40: testing, driver training, fixing, perfecting Remember, a good driver always beats a good robot Note: practice bot construction happens in parallel with competition bot construction. |
| Thread Tools | |
| Display Modes | Rate This Thread |
|
|