Quote:
Originally Posted by DampRobot
My main thought is we could get better turnaround times this way. The frame can be out for a few days for PC, but if a part has to be anoed, you generally want it pretty fast to assemble and test. Depending on the sponsor, the wit might be too long.
|
San Jose has a lot of anodizing shops, if you're just looking to get something done black I'm certain you can find many with same day service.
We've had several places anodize for 973. All in LA, San Jose or Fresno. They drive a truck/van all the way to SLO 3 days a week. We get 2 day turnaround on everything.
I'm certain you can get next day up there.